Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 28, 2026 at 8:00 PM
Updated May 29, 2026
Renovation of a water / sewer project in Northport, Alabama. Completed plans call for the renovation of a water / sewer project.
Rehabilitation of the interior and the exterior a 1.0 million gallon ground storage municipal water tank. The City of Northport shall be responsible for draining the tank, operating the valves as necessary, and collecting bacteriological samples prior to placing the tank back into service upon completion of the project. All other work shall be performed by the Contractor. Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is seventy five (75) consecutive calendar days, which shall include a maximum of sixty ( 60) calendar days of tank being out of service. Document Note: Electronic copies of plans, specifications and Contract Documents may be obtained at no cost to prospective bidders. Requests for digital copes can be made via online. Deposits by prime Contractor bidders are refundable in full upon return of all documents in reusable condition within ten ( 10) days of bid opening. Additional sets of bid documents for prime Contractor bidders, subcontractors, vendors or dealers may be obtained upon payment of the same deposit. Such deposits will be refunded, less the cost of printing, reproduction, handling and distribution, if all the documents are returned in reusable condition within ten (10) days of bid opening. A Mandatory Pre-Bid Conference was held Wednesday, May 27, 2026, at 10:00 a.m. in Council Chambers of Northport City Hall, located at 3500 McFarland Boulevard, Northport, Alabama 35476. The City reserves the right to reject all bids and/or reject and rebid the Project should it determine the same is in the best interest of the City. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the City for an amount not less than 5 percent of the City's or its engineers estimated cost of the Project or of the total bid in the proposal, but in no event more than $10,000.00.
GC Bidding
Water / Sewer
$400,000.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2026
July 3, 2026
To Be Determined, Northport, AL
Related To This Project
Northport, AL
Bid Date: Apr 22 2026
Northport, AL
Bid Date: Apr 14 2026
Northport, AL
--
Northport, AL
Bid Date: Mar 25 2026
Northport, AL
Bid Date: Feb 23 2026
Northport, AL
Bid Date: Feb 23 2026
Northport, AL
Bid Date: Feb 23 2026
Northport, AL
Bid Date: Feb 23 2026
Northport, AL
Bid Date: Feb 23 2026
Northport, AL
Bid Date: Jan 30 2026
Northport, AL
Bid Date: Dec 05 2025
Northport, AL
Bid Date: Nov 13 2025
Northport, AL
--
Northport, AL
Bid Date: Dec 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
