Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work for a sidewalk / parking lot in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot.
Fulton Site Development Project Deadline to submit Questions Jun 11th 2026, 5:00 PM CDT, Question submitted Electronically The Project consists of the construction of a Forty - Three (43 ) space concrete parking lot , drainage , electrical and site lighting , security system , and landscaping . The location of the project is at 8030 1/2 Fulton St , Houston , TX 77022 . PROJECT SCOPE The Scope of Work for this Project shall consist of providing all supplies , support , services , data , labor , tools , materials , equipment , supervision , construction and all else required to construct the project . The work shall include , but not be limited to , the following major items , to the extent specified and indicated . Provide administration and construction support service to complete the work . Coordinate with utility owners , government agencies , businesses , neighborhood associations and any other stakeholders within the project limits . Provide SWPPP per all applicable requirements . Project consists of two plan sets , one for site improvements and one for improvements in the public Right -ofWay . The scope of this project includes both plan sets . Contractor shall have access to the full site during construction ; however , the project must be scheduled so that the proposed trailers may be installed on site within Forty -five (45 ) calendar days of Notice to Proceed (NTP ). This includes sanitary , water , electrical , security and earthwork needed to install two trailers . Trailer installation will be handled by METRO outside of this scope . Once installed the contractor shall complete utility connections for the trailers . Removal of above ground facilities including sidewalks , curbs and pavement as shown in the construction plans . Construct water line , sanitary sewer lines , storm sewer lines , sidewalk , pedestrian ramps , pavement , pavement markings , site lighting , fencing , and landscaping and as shown in the construction plans . Provide network and communication improvements as shown in the construction plans . Contractor shall provide a clean and safe Construction Work Zone during the construction and prior to written acceptance by METRO . Contractor shall also be responsible for complying with Contract Documents including specifications , regulations , and local government codes . Contractor shall submit a resource loaded schedule with their bid . The resource loaded schedule will be used to determine that the bidder has sufficient resources to complete the job within the specified period of performance . Contractor shall be responsible for submission of a project schedule (Primavera P6 format ) that includes sound methodology for construction activities for the duration of the project . The contractor shall provide coordination and cost control management for the duration of the project . Documents are available at https://ridemetro.bonfirehub.com/opportunities/
GC Bidding
Sidewalks / Parking Lot
$500,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
August 24, 2026
8030 Fulton St, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
Bid Date: Jun 16 2026
Houston, TX
Bid Date: Jun 16 2026
Houston, TX
Bid Date: Jun 12 2026
Houston, TX
--
Houston, TX
Bid Date: Jun 22 2026
Houston, TX
Bid Date: Jun 12 2026
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Jun 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
