Site work and paving for a water / sewer project in Newark, New Jersey. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

The project involves the reconstruction and upgrade of approximately 2,400 linear feet of wharf at Berths 55 and 57, with work performed in two sequential phases -- Phase 1 completing Berth 55 before Phase 2 work at Berth 57 can begin -- while maintaining a minimum of three operational berths at the active container terminal. The primary structural scope involves demolition of the existing timber pile-supported wharf system followed by installation of a new combination wall consisting of 36-inch diameter steel pipe piles and AZ18 intermediate steel sheet piles, new concrete-filled crane rail beam piles, new tie rod systems, and full reconstruction of the reinforced concrete wharf deck, crane beams, fascia beams, and bollard systems. Supporting scopes include new underground electrical ductbanks, crane power vaults, temporary above-ground crane power connections, installation of owner-furnished marine fender systems and 150-tonne bollards, container crane installation, earthworks, and asphalt pavement restoration. Scope of work (but not limited to): Electrical, Asphalt Paving, Piles, Tiebacks, Environmental, Diving, Special Inspections, Demolition, Rebar, Post-Tensioning, Bulkhead Docks, Soil Erosion Control, Site Work, Crain Rails, Concrete Work, CPM Scheduling, Surveying, Office Cleaning, Concrete Ready-Mix, Dumpsters, MPT, etc. The project targets mobilization in July 2026, Berth 55 completion by August 2027, and Berth 57 completion by September 2028, and explicitly excludes all dredging work, which is designated as a separate contract. Duration: 26 MONTHS Prevailing Wage: YES Buy America: YES OCIP: NO Participation Goal: 10% MWBE (1% at least MBE) Bids, and all inquiries regarding the bidding documents, are to be submitted to the following: Gregory Kim Sr. Port Engineer PNCT 241 Calcutta St Port Newark, NJ 07114 Greg.Kim@pnct.net Send also a copy of the inquiries to: James Kukucka Vice President of Engineering and Procurement PNCT 241 Calcutta St Port Newark, NJ 07114 James.Kukucka@pnct.net

GC Bidding

Water / Sewer

$10,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,169
Active Projects
606
Bidding Soon
8,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

July 6, 2026

Project location map

To Be Determined, Newark, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.