Published July 14, 2026 at 8:00 PM

Updated July 20, 2026

Demolition, site work and renovation of a retail development in Norfolk, Virginia. Completed plans call for the demolition of a retail development; for the renovation of a retail development; and for site work for a retail development.

The work under this project involves the systemic demolition of all existing above-grade structures within the Military Circle Mall complex, down to the existing concrete slab-on-grade. The Ross tenant place, Sentara building, and other designated locations are excluded from the scope of work and shall remain undisturbed. The Bidder shall provide a Lump Sum cost to provide all labor, material, equipment, and supervision required to perform the work as described herein. Project Location: 880 N. Military Highway, Norfolk, VA. Question Deadline 06/26/2026 at 4:00 PM ET All Requests for Information (RFIs) shall be submitted electronically. Any RFI submitted after this date cannot be guaranteed a response by the City. Work to be Substantially Completed in: 465 calendar days Liquidated Damages: one thousand dollars ($1,000.00) per day Performance Bond: one hundred percent (100%) Payment Bond: one hundred percent (100%) Bid Bond: five percent (5%) A Bid Bond, certified check, or cashier's check made payable to the Treasurer, City of Norfolk, for five percent (5%) of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror's acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Demolition of the all existing structures down to the existing concrete slab-on-grade with the exception of the Ross tenant space, the Sentara building, and as indicated. The hotel raised first floor slab, reinforced concrete mat foundation, pool, pool deck, ramps and steps shall be removed in their entirety. The work includes alterations to the Ross tenant space and Sentara building to maintain utility services and to provide a watertight and structurally sound exterior envelope. The work includes hazardous material abatement, demolition, construction waste management, structural steel, metal framing, sheathing, EIFS system, EPDM roofing, flashing, electrical, and other Work as indicated in the Contract Documents.

Bid Results

Retail

$2,880,000.00

Public - City

Demolition, Renovation, Site Work

51

15

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
83
Bidding Soon
1,658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2026

September 11, 2026

Project location map

880 N Military Hwy, Norfolk, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.