BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 15, 2026

Site work for a development in San Jose, California. Completed plans call for site work for a development.

Please refer to the Notice to Bidders for the full Summary of Work for this Project. Online Q&A Yes Question Deadline 06/26/2026 at 5:00 PM PTWritten questions must be submitted in Online no later than nine (9) calendar days before the deadline for receipt of Bids. The estimated cost of the Project is between $2.5 million to $3.5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. The Work to be completed under this Contract shall consist of furnishing all tools, Equipment, Material, supplies, and manufactured articles, and all labor, transportation and services, including fuel, power, water, and essential communications, and of performing all Work or other operations required to construct the Upper Berryessa Creek Off-Site Mitigation Project as illustrated on the Plans and as detailed in these Specifications. The Project is being constructed to provide mitigation to construction impacts for the Berryessa Creek Flood Risk Management Project completed in 2018 and required by the San Francisco Bay Regional Water Quality Control Board. Any quantities provided with Article 12.01. Summary of Work are approximate. Should there be a discrepancy between the quantities included herein and elsewhere in the Contract documents, those quantities specified elsewhere on the Contract shall govern. The Work and Contractor's qualifications include, but is not limited to, the following:Preparing the sites for planting as shown in the Drawings.Planting of approximately 17,858 container stock units (Type TB2) in accordance with the Drawings.Planting of approximately 165 container stock units (Type TB4) in designated locations with the Drawings. Installation of approximately 791 live stake cuttings placed and oriented as specified to promote establishment. f. Hydroseeding of approximately 16.72 acres, utilizing specified seed mix, carrier, and application rates. Notice to Bidders e. Planting of approximately 425 plug units, in accordance with the approved species list and spacing requirements shown in the Drawings.Installation of the irrigation system including the operation and maintenance for a period of five (5) years following planting completion.

Bid Results

Conservation and Development

$5,963,750.00

Public - City

Site Work

74

9

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
165
Bidding Soon
2,520
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2026

September 7, 2026

Project location map

5750 Almaden Expressway, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.