Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work and new construction of a pre-engineered storage facility in Aubrey, Texas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Mustang SUD is soliciting qualifications for a Construction Manager at Risk for the preconstruction services and construction of a pre-engineered metal building with office area for Fleet services at their headquarters. The scope of the Work will include designing and constructing new Operations Building D for the Owner to be used as a shop area with office. The work generally includes the following: o Development of the architectural and engineering documents from the 10% Design Level included in this package to completion by registered Professional Engineer(s) and Architect(s) in the State of Texas. This will be included in the Pre-Construction Price; o Demolition of the existing maintenance building in the location of the future building. Record drawings are available for the existing building; o Construction of a high-performance Pre-Engineered Metal Building (PEMB) 168' ft. by 80 ft. facility engineered to bridge industrial-scale functionality with high-efficiency conditioned spaces in full compliance with 2021 IECC (Climate Zone 3) energy standards. Building to be durable 26-gauge PBR metal enclosure including drive-through bays and semi-heated shop space. Bay areas are to be included for four general mechanical bays, two painting bays, spaces for tires, parts, and fabrication. Bay areas will include overhead doors. A large enclosed covered area is also included. A conditioned pod for office space and locker rooms (30 ft. by 80 ft.) will be thermally isolated. Further details on plumbing, fixtures, HVAC, and other building requirements are included in the preliminary drawings included in the 10% Technical Memorandum. o Permitting will be required as noted in the 10% Technical Memorandum included in this package. o Geotechnical work will include a drilled shaft concrete pier design for the building. Geotechnical report is included in the package. o Site civil work will include water, sewer, gas, and electrical as well as concrete paving. o Electrical work will include coordination for new power supply, electrical equipment to serve building, and installation of an Owner provided generator. o Erosion control during construction. Questions regarding this project should be directed to: Markay Brown, PE, Garver Project Manager, at Mbrown@GarverUSA.com
GC Bidding
Warehouse / Distribution - Pre-Engineered Storage Building
$5,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2026
September 1, 2026
7985 FM 1960, Aubrey,, Aubrey, TX
Related To This Project
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
Bid Date: Jun 15 2026
Aubrey, TX
Bid Date: Jun 17 2026
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
--
Aubrey, TX
Bid Date: Apr 16 2026
Aubrey, TX
Bid Date: Apr 22 2026
Aubrey, TX
--
Aubrey, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
