BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 3, 2026

Site work and paving for a road / highway in Tuscaloosa, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on I-20/I-59 from the SR-300 (Exit 62) Interchange to the Joe Mallisham Parkway (Exit 68) Interchange west of Tuscaloosa. Length 6.505 mi. The Bracket Estimate on this project is from $4,864,860 to $5,945,940 . Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 05 - Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on I-20/I-59 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$5,945,940.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
60
Bidding Soon
814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

August 25, 2026

Project location map

I-20, Tuscaloosa, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.