Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a sidewalk / parking lot in Anchorage, Alaska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Alaska Housing Finance Corporation is seeking bids to modify the existing concrete stairs and porch entrance, adding a covered wood ADA ramp at 4319 Reka Dr. Anchorage, AK 99508. Minority and women-owned businesses are encouraged to submit proposals. Question Deadline 06/05/2026 at 4:00 PM AKT Question Submittal EMAIL: submittals@ahfc.us The Alaska Housing Finance Corporation is an equal opportunity employer. 25000-100000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The existing concrete porch shall have a wood deck installed over the surface to match the existing entry door height . The porch shall also be extended to the east to accommodate construction of the new ramp . The ramp shall span over the existing asphalt walkway leading toward the driveway and shall be constructed with a maximum slope of 1:12 and a minimum clear width of 36 inches . ADA access beyond the ramp to the street is not included as part of this project . The existing top concrete step shall be raised and extended eastward to match the new landing elevation , allowing pedestrian access from the street around the new ramp . New railings shall be installed throughout the project area . The existing railing leading from the street shall be extended around the new step -up area to the patio wall . Refer to attached photos for clarification of existing conditions and intended layout . The new ramp and extended porch area shall be covered with corrugated smoke polycarbonate roof panels , including all required closure strips , framing , and supports . Roofing shall cover the entire porch and ramp assembly and extend a minimum of 6 inches beyond each end . Gutters and drains shall be installed at each low side of the roof . All wood materials shall be Hem -Fir above -ground pressure -treated lumber . Structural framing shall include a minimum of 2x6 joists and 2x8 rim joists . All new construction shall be supported on concrete footings with 4x4 posts attached using Simpson ABU66Z post bases or approved equivalent . Joists shall be connected to rim joists using Simpson HUS / LUS joist hangers or approved equivalent . Guard posts shall be installed using the Internal Guard Post Installation method with Simpson SDWS Timber screws of sufficient length to securely penetrate blocking . Transitions between the existing concrete and the new ramp shall be smooth and wheelchair accessible . All appropriate fasteners and connectors shall be used in accordance with manufacturer specifications and applicable building codes . All measurements provided are approximate and shall be field verified by the contractor prior to construction . A. Contractor is responsible for all costs associated with the completion of this project , including but not limited to , permitting and inspections , labor , materials , demolition , disposal , complete construction , control of active work site (s ), and all required documentation and reporting , to include requirements of the applicable Authority Having Jurisdiction . B. Tenants will require 48 hours ' notice before beginning work . C. Work to completed by August 1, 2026 . D. This building is occupied and foot traffic will need to be granted during length of the project . Building is to be left with a safe entrance and exit at the end of each work day . E. Alternative proposals will be accepted . Bidders wishing to submit an alternate proposal must submit sufficient documentation to allow AHFC review ; AHFC retains sole discretion in acceptance of alternate proposals . F. It is understood and agreed that by submitting a bid that the Contractor has examined these contract documents , drawings and specifications and has visited the site of the work deemed necessary to submit a fully loaded bid , and has satisfied himself / herself relative to the work to be performed . In addition to the general description , please see the following attachments to generate a scope of work and bid price . G. Additional work items or modification of the scope as required by the discovery of unforeseen circumstances will be addressed through the Request for Proposal / Bid / Change Order Process .

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
8
Bidding Soon
190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 13, 2026

Project location map

4319 Reka Dr, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.