BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 2, 2026

Site work and new construction of a clubhouse / community center in Ayer, Massachusetts. Completed plans call for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.

Construction of a new two-story Senior Center building, located at an undeveloped Town-owned parcel of land on Bishop Rd. in Ayer, MA. The proposed project includes general building construction and trade work (mechanical, electrical, plumbing, etc.) in accordance with the Plans and Specifications, as well as associated sitework and utility construction/connections. The building is designed to be two stories and will include an elevator. The construction duration is approximately 14 months. Scope also includes coordination with / connection to new site utilities, which are being brought to the undeveloped site under separate contracts with the Town / Department of Public Works. Estimated Cost 11.5 Million Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Elevators Question Deadline: June 17, 2026 12:00 PM Questions should be submitted by email to Matt Sturz at MSturz@vertexeng.com and Laureen Westman OPMprocurement@vertexeng.com Trade Contractor Statement of Qualifications Forms from interested subcontractors: Elevators (ECC $210,000). If your firm submitted a response to the initial RFQ, no additional response is required for this second solicitation. Only prequalified General and Subcontractor firms will be permitted to submit bids for the category of work in which they were prequalified. The Owner's Project Manager is The Vertex Companies and the Project Designer is Catlin Architecture PC.

Post-Bid

Clubhouse / Community Centers

$11,500,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
857
Active Projects
327
Bidding Soon
5,518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2026

September 21, 2026

Project location map

Bishop Rd, Ayer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.