Demolition and site work for an educational facility in Apex, North Carolina. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.
The construction of West Lake Middle School Mobile Classroom Demolition and Site Remediation. Questions concerning the project shall be submitted in emailed to Nick Sursa at nsursa@wcpss.net. All contractors submitting bids will be required to provide either: (1) an affidavit that includes a description of the portion of work to be executed by minority businesses, expressed as a percentage of the total contract price, which is equal to or more than the applicable total; (2) documentation of its good faith effort to meet this goal, including any advertisements, solicitations, and evidence of other specific actions demonstrating recruitment and selection of minority business for participation in the contract as required by the contract documents; or (3) an affidavit verifying that the bidder will be self-performing all of the work as defined in N.C Gen. Stat. 143-128.2. Failure to file the required affidavit or documentation that demonstrates that the contractor made the required good faith effort is grounds for rejection of the bid. The Owner's designated representative for this project is Nick Sursa, nsursa@wcpss.net. The Wake County Public School System reserves the right to reject any and all bids, waive informalities and irregularities in bidding and to accept bids which are considered to be in the best interest of the School System. The Wake County Public School System also reserves the right to require any bidder to submit information needed to determine if said bidder is responsible within the meaning of N.C. Gen. Stat. 143-129. Scope of work shall include the following items : o Demolition shall include removal and proper disposal of ten single mobile units including wood ramps , steps, decks , foundations /piers , utilities , and any related components required for complete removal prior to site remediation . Protect all work areas with 4 ft . orange safety fence supported by T-posts . o The contractor is responsible for locating underground utilities . Lower and Cap existing underground power and pull wires prior to grading . Grade work areas to match and daylight to existing surrounding ground elevations and fill low areas to prevent water ponding . Prepare the area with 3" of topsoil and install TifTuf Bermuda sod on all impacted work areas, including all areas impacted by site access, hauling and required work activities . Sod shall be watered for 3 weeks following installation . Do not place sod when temperature is below 32 degrees Fahrenheit . Do not use frozen sod or place on frozen soil . After demolition is completed , the contractor shall provide a letter confirming the mobiles have been demolished , including the name and location of the landfill (s) and/or recycling facilities used to dispose of all materials . The contractor is required to pull a demolition permit with Wake County . WCPSS will reimburse the contractor for all permit fees after contractor submits documentation of permit fees paid . Asbestos was not identified per the inspection completed on February 2, 2026 , by Matrix Health and Safety Consultants , LLC . Work items may be added or removed following the pre-bid walkthrough . The contractor shall include all labor , equipment , materials , hauling , and disposal necessary to complete the work
Post-Bid
Educational
$500,000.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
October 6, 2026
4600 W Lake Rd, Apex, NC
Related To This Project
Apex, NC
Bid Date: Jul 29 2026
Apex, NC
Bid Date: Jun 18 2026
Apex, NC
Bid Date: Jun 11 2026
Apex, NC
--
Apex, NC
Bid Date: Apr 29 2026
Apex, NC
--
Apex, NC
--
Apex, NC
Bid Date: May 05 2026
Apex, NC
Bid Date: May 05 2026
Apex, NC
Bid Date: May 05 2026
Apex, NC
Bid Date: May 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.