Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 2, 2026 at 8:00 PM
Updated June 3, 2026
Site work and new construction of a water / sewer project in Storm Lake, Iowa. Completed plans call for site work for a water / sewer project.
The general description of the work covered includes the construction of a water well with stainless steel production casing, water main, minor grading and seeding, and all other miscellaneous components necessary to complete the project according to the plans and specifications. Bids are to be submitted on official proposal forms furnished by the Engineer, enclosed in a sealed envelope and addressed to the City. Each proposal must include a cashier's check, certified check, certified share draft, or a bidder's bond with a corporate surety satisfactory to the City in an amount equal to ten percent (10%) of the total amount of the proposal. The successful bidder must provide a corporate surety bond for one hundred percent (100%) of the contract price, guaranteeing performance and maintenance for at least two years. The project is partially funded by federal funds requiring compliance with certain federal regulations. Contractors will be paid ninety-seven percent (97%) of the value of acceptable work completed, with final payment made at least thirty-one days after completion and acceptance. Work must commence within ten days of notice to proceed, be substantially complete by November 30, 2026, and fully complete by December 31, 2026. Liquidated damages of $500 per calendar day will be assessed for each day the work remains uncompleted after these dates. Preference is given to products grown and coal produced in Iowa, and resident bidders may receive preference over nonresidents as specified by state law. Failure to submit a fully completed Bidder Status Form may result in rejection of the bid.
GC Bidding
Water / Sewer
$1,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
August 9, 2026
620 Erie Street, Storm Lake, IA
Related To This Project
Storm Lake, IA
Bid Date: Jun 25 2026
Storm Lake, IA
Bid Date: Jun 16 2026
Storm Lake, IA
--
Storm Lake, IA
Bid Date: Apr 13 2026
Storm Lake, IA
Bid Date: Jan 22 2026
Storm Lake, IA
Bid Date: Jul 26 2021
Storm Lake, IA
--
Storm Lake, IA
Bid Date: Oct 22 2025
Storm Lake, IA
Bid Date: Aug 26 2025
Storm Lake, IA
Bid Date: Aug 13 2025
Storm Lake, IA
Bid Date: Apr 15 2025
Storm Lake, IA
Bid Date: Apr 08 2025
Storm Lake, IA
Bid Date: Jan 22 2025
Storm Lake, IA
Bid Date: Jan 22 2025
Storm Lake, IA
Bid Date: Dec 23 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
