Published June 3, 2026 at 8:00 PM
Updated June 4, 2026
Site work and paving for a bridge / tunnel in Longueuil, Quebec. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Reference number: 20150066 Deadline for receipt of complaints 2026-06-17 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 24 Description The City of Longueuil is requesting bids for: REPAIRS TO THE ROLAND-THERRIEN BRIDGE AND THE EDNA-MARICOURT WALKWAY Procedure for awarding the contract: Lowest price offered Subject of the contract: The City of Longueuil wishes to obtain bids for the repair work of the Roland-Therrien bridge and the Edna-Maricourt walkway, as described in these tender documents. The work to be carried out is mainly, but not limited to: For the Roland-Therrien bridge: o Repair of lamppost support; o Repair of steel and GTOG restraint systems; o Repair of concrete slides; o Replacement of asphalt mix on deck and at approaches; o Installation of a new membrane on the bridge; o Replacement of the engaged fitting of an apron joint; o Reconstruction of the deck joint; o Local repairs of the slab; o Repair of prestressed concrete beams; o Reconstruction of the perimeter of the support devices; o Repairs to roof trusses with no additional thicknesses; o Repair of columns with formwork without additional thickness; o Replacement of steel segment anchors. For the Edna-Maricourt bridge: o Repair of the underside of the slab with formwork without additional thickness; o Repair of guardrail posts; o Repair of anchorages on railings; o Fence repair; o Adding drains; o Installation of a non-slip membrane; o Repair of caster wheel with formwork without additional thickness; o Basic repair of street lights; o Repair of diaphragms; o Cleaning of joints and adding bolts. Duration of the work: It is planned to start work at the end of summer 2026. The work must be carried out simultaneously on both sites. The duration of the work on the Roland-Therrien bridge is a maximum of 87 days, while that on the Edna-Maricourt walkway is a maximum of 71 days. More specifically, the demolition and repair work taking place at night for the Roland-Therrien bridge is: o The repair and painting of steel slides; o Local repairs to the top of the slab; o The repairs of concrete slides and lamppost blocks. The demolition and repair work taking place at the end of the week for the Roland-Therrien bridge are: o The removal of asphalt; o The installation of the waterproofing membrane; o The laying of the asphalt; o The replacement of the engaged trim on the deck joint. The demolition and repair work taking place at night for the Edna-Maricourt footbridge are: o Local repairs of the slab beneath the deck; o Diaphragm repairs; o The repair of lamppost bases Site inspection: By submitting a tender, the TENDERER is deemed to have visited and inspected the worksite and the ground conditions, and to have satisfied themselves as to the general working conditions, storage facilities and access to the site.
GC Bidding
Bridges / Tunnels
$3,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2026
August 31, 2026
Multiple Locations, Longueuil, QC
Related To This Project
Longueuil, QC
Bid Date: Jun 30 2026
Longueuil, QC
Bid Date: Jun 30 2026
Longueuil, QC
--
Longueuil, QC
Bid Date: Jul 07 2026
Longueuil, QC
--
Longueuil, QC
Bid Date: Jun 08 2026
Longueuil, QC
Bid Date: May 28 2026
Longueuil, QC
Bid Date: Apr 29 2026
Longueuil, QC
Bid Date: May 22 2026
Longueuil, QC
Bid Date: Apr 17 2026
Longueuil, QC
Bid Date: Apr 21 2026
Longueuil, QC
Bid Date: May 20 2026
Longueuil, QC
Bid Date: May 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.