BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 9, 2026

Renovation of an educational facility in Fairhaven, Massachusetts. Completed plans call for the renovation of a educational facility.

Fairhaven High School Storage Facility Roof Project The Fairhaven Public Schools , hereinafter called the " AWARDING AUTHORITY ," invites sealed bids from Contractors for the " Storage Facility Roof Project " at the Fairhaven High School located at 12 Huttleston Avenue , Fairhaven , Massachusetts , 02719 . The project consists of installing flashing , roof , gutters , and downspouts . All work shall be performed as indicated . A. Inspect the roof deck . B. Verify that roof penetrations and plumbing stacks are in place and secured to deck surfaces . C. Verify deck surfaces are dry and free of ridges , warps , or voids . ROOF DECK PREPARATION * Follow the shingle manufacturer's recommendations for acceptable roof deck material . * Broom clean deck surfaces under eave protection and underlayment prior to the Application . A. SELF - ADHERED WATERPROOF UNDERLAYMENT & SHEET METAL 1. Apply Waterproof Underlayment as protection in accordance with the manufacturer's instructions . 2. Clean the roof deck until it is free of dirt , dust , nails , and other materials . Provide a clean , dry , and smooth deck surface to assure proper adhesion of the Waterproof Underlayment to the deck 3. Align unrolled material with lower of roof and hold in place . Lift starting end of material approximately 1 foot , peel back and fold under at least 6 inches of both sheets of protective release film . 4. Carefully return the exposed adhesive surface to the deck and press firmly in place . 5. At air and or surface temperatures less than 450F , tack Waterproof Underlayment in place with roofing nails . Reroll material from the other end until the peeled and folded back film is exposed . 6. Apply Waterproof Underlayment as protection in accordance with the manufacturer's instructions . Folded back film is exposed . 7. Minimum side and end overlaps : Six (6) inches . 8. Application dimensions identified in this section are measured on the roof slope and are applicable after the Waterproof Underlayment has been overlapped . Question Deadline 06/12/2026 at 1:00 PM ET Bidders requiring clarification or interpretations of the Contract Documents shall make a written request to, Mark Balestracci , 508-979-4000 ext 4111 , or emailed mbalestracci@fairhavenps.net

Sub-Bidding

Educational

$130,000.00

Public - City

Renovation

11

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
619
Active Projects
353
Bidding Soon
3,839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

July 20, 2026

Project location map

12 Huttleston Ave, Fairhaven, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.