Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Napa, California. Completed plans call for site work for a water / sewer project.

These improvements are intended to address ongoing erosion , stabilize adjacent residential fencing , and improve the long -term reliability of the drainage system . The work shall include but may not be limited to : Napa County is seeking qualified contractors to complete improvements to an existing stormwater drainage facility located along the rear property lines of residences on W Pueblo Avenue in Napa , CA. The project will include the installation of a new 24 -inch HDPE storm drain pipe within an open drainage ditch located behind residences on W Pueblo Avenue in Napa , CA. Work includes excavation , pipe installation , connections to existing storm drain systems and private laterals , backfill and compaction , installation of drainage inlets , vegetation clearing and grubbing , erosion control , and site restoration. Construction will occur within an existing disturbed corridor with access provided by Napa County . No known underground utility conflicts are anticipated . The Contractor will be responsible for protecting adjacent properties and restoring all disturbed areas upon completion of the work . Construction is anticipated to begin in September and be completed by October 2026 . The work shall be conducted during favorable weather with no ambient temperatures less than 55 degrees F. This work includes sole sourced 3M signage material for the purpose of conformity . The scope of work shall include and not be limited to : o Mobilization Construction Debris Area Setup and Disposal o Construction activities to completely stop between 5 pm and 8 am Implementation on Erosion and Sediment Control Best Management Practices (BMP ) o Construction Area Signs and Temporary Traffic Control (as needed ) per CAMUTCD standards , Caltrans and as directed by the Engineer and approved by County . All construction activities , including any temporary staging , shall occur within County right of way .Final cleanup and demobilization o Project Closeout Construction must occur in favorable weather and may only take place within designated working hours. The intent is to address erosion, stabilize adjacent residential fencing, and improve the reliability of the drainage system. The scope includes mobilization, debris area setup and disposal, implementation of Best Management Practices for erosion and sediment control, installation of temporary traffic control and signage as needed, and all necessary cleanup and project closeout. Bids are required for the entire work; neither partial nor contingent bids will be considered. All work must comply with the technical specifications, and the County reserves the right to increase, decrease, or omit portions of the work as deemed necessary or expedient by the Engineer. The Contractor must be fully licensed, attend a mandatory pre-bid walkthrough, and submit all inquiries via the County's e-Procurement Portal. A bid guarantee is required, and successful bidders must furnish performance and labor/material bonds, as specified. Question Deadline 06/25/2026 at 12:00 PM PT

GC Bidding

Water / Sewer

$225,000.00

Public - County

Site Work

9

7

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
192
Bidding Soon
3,618
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

September 1, 2026

Project location map

W Pueblo Ave, Napa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.