BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work, paving and renovation of a mixed-use development in Buckland, Quebec. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for the renovation of a multi-residential development.

Reference number: 20150643 Deadline for receipt of complaints 2026-06-17 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with two documents Description Description of the work The project includes in particular the following works: Excavation of the perimeter of the building, replacement of the foundation drain and waterproofing of the foundations; Removal of porch curbs and construction of new sidewalks, curbs and concrete slabs; Replacement of the building's water supply from the water main (existing water main and inlet are maintained); Connection of municipal services; Upgrading of several electrical panels as well as the fire alarm system for the entire building; Addition and upgrading of basement ventilation; Addition of surveillance cameras in common areas and corridors; Replacement of engine heater bollards; Final sealing of three existing windows with concrete; Repair of damaged masonry, including replacement of concrete foundation blocks; Replacement of interior doors leading to living quarters, stairwells and common areas; Repair of fibreglass balconies and guardrails in upper floor dwellings; Repair of the curbs, paving and parking line. Coordination and impacts of the work During the work, the owner does not plan to relocate the tenants. The contractor and the main subcontractors concerned must ensure, before the start of the work, to coordinate the required openings and validate the routes taken for connecting the various equipment (wiring, conduits, pipes, etc.). It is imperative to coordinate and simplify interventions in order to minimize work inside the housing units as well as impacts on occupants. Close coordination with the owner and project professionals is also desired. If necessary, the contractor may plan the work in one or more phases to ensure the smooth running of the project and limit inconvenience for the occupants. Delivery schedule Call for tenders publication 2026-06-03 Complaint deadline 2026-06-17 Deadline for submitting bids 2026-06-30 Start of work 2026-08-17 Completion date of the work 2026-11-22

GC Bidding

Multi-Residential

$600,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
99
Bidding Soon
1,130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 17, 2026

Project location map

To Be Determined, Buckland, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.