BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2026 at 8:00 PM

Updated July 8, 2026

Renovation of an educational facility in Mandeville, Louisiana. Completed plans call for the renovation of a educational facility.

Separate sealed bids are requested for the project at Marigny Elementary School, involving the replacement of Fresh Air Units at the 200 and 300 Wings. Bidding documents are supplied by the Architect and may be obtained in person or electronically. Bid security in the amount of five percent (5%) of the base bid and all alternates is required, submitted as a certified check, cashier's check, or bid bond. The successful bidder is required to provide performance and payment bonds equal to 100% of the contract amount. Bidders must comply with Louisiana Contractors Licensing Law. The owner reserves the right to reject any and all bids as permitted by law. Bidders may submit bids electronically according to Louisiana statutes. Marigny Elementary School, Replacement of Fresh Air Units for 200 and 300 Wings B. All transmittals, correspondence, requests for payment, etc. shall reference the project title in its entirety. C. Owner owned dumpsters are not to be used for disposal. D. It is the Contractor's responsibility to protect all existing vegetation. Any trimming of shrubs or trees shall be accomplished by a licensed Arborist. The Contractor is responsible for hiring the licensed Arborist. E. St. Tammany Parish School Board staff must be notified if any building exit or driveway is to be blocked. F. Furnish a copy of the Contractor's Site Safety Plan and office phone number and cell number to St. Tammany Parish School Board. 1.2 WORK INCLUDED: A. All work shall be as described in these specifications and shown on the accompanying drawings. B. The work includes furnishing of all labor, equipment and materials needed for a complete project. This work shall be in accordance with the plans and specifications and the contractor is cautioned to carefully study the field conditions, the Contract Documents and the Bid Form. C. Description of Base Bid: The scope consists of HVAC equipment removal and replacement at the above noted STPSB campus location which includes: (6) DX Split Dedicated Outdoor Air System (DOAS) Air Handling Units (AHUs) and their corresponding Condensing Units (CUs). D. The Architect/Engineer is the Designer. Any location in the construction documents (drawings and project manual) where the term "Architect" or "Engineer" appears, it shall be considered the "Designer". If there are any questions regarding this project, please contact the St. Tammany Parish Public School System Construction Department at 985-898-3287.

Bid Results

Educational

$640,783.00

Public - City

Renovation

12

8

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
18
Bidding Soon
1,063
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

July 31, 2026

Project location map

1715 Viola St, Mandeville, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.