Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 24, 2026

Site work and new construction of an educational facility in Auburn, Alabama. Design plans call for the construction of a educational facility.

Project scope includes but is not limited to restoration of the existing building envelope. TIMELINE: As of September 18, 2026, an architect has been selected. Design is underway and anticipated to be complete April 2027. Information regarding contractor opportunity and construction start to be disclosed.

Design

Educational

$15,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
57
Bidding Soon
1,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2027

Project location map

To Be Determined, Auburn, AL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed