Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Site work for a civil project in Del Bonita, Alberta. Completed plans call for site work for a water / sewer project.

Reference Number 0000323877 Scope includes but is not limited to:- Work of this Contract comprises removal and replacement of an underground sewage septic tank and associated piping, electrical and surface remediation located at Del Bonita Border Crossing Station near Del Bonita AB, and further identified as Del Bonita PoE - Septic System Replacement. Remove and dispose existing concrete Septic Tank; Work with Consultant to obtain soil samples of immediate area for testing; Remove contaminated soil as required; Make connections (plumbing) to existing building service connection; Supply and install new manhole and frame and cover; Supply and install 100mm PVC SDR35 Sanitary gravity main and associated insulation; Supply and install concrete 2-cell septic tank, c/w risers and cover; Supply and install electrical components for submersible lift pump, including all conduits, wiring, controls, floats, piping, supports, and panel box connections as per Electrical drawings; Supply and install weeping trench materials; Any and all other work as provided on Civil drawings. Provide Temporary Washroom Facilities during construction for use by Occupants. .1 The Contractor shall provide, maintain, service, clean, stock, and facilitate the regular emptying of a minimum two-washroom trailer unit for use by Occupants, workers, construction personnel, and the general public throughout the duration of the Project. Temporary facilities shall remain in service until the permanent washroom facilities are fully operational, inspected, and accepted for use by the Owner. .2 The washroom trailer shall be a self-contained unit equipped with a functioning sink supplied with potable water, flushable toilets, lighting, ventilation, heating as required, and all necessary utilities to ensure safe and comfortable year-round operation. .3 Portable toilets, "Port-a-Potty" units, chemical toilets, or similar temporary facilities are not acceptable unless specifically approved in writing by the Owner. .4 The Contractor shall be responsible for all costs associated with the supply, installation, operation, servicing, cleaning, maintenance, pumping, winterization, utility connections, and removal of the temporary washroom facilities. Itemized pricing shall be provided upon request. .5 The Contractor shall provide a complete, fully operational septic system designed to support continuous use of the temporary washroom facilities in a remote, critical facility environment. The system shall be designed and installed to accommodate anticipated occupancy levels and site conditions and shall be suitable for limited maintenance access and harsh climatic conditions. .6 The Contractor shall be responsible for monitoring, maintaining, and servicing the septic system throughout the Project to ensure uninterrupted operation and to prevent overflows, leaks, odours, environmental contamination, or service disruptions. Work shall be completed by installers who are certified by Provincial Authorities Having Jurisdiction (AHJ) to install Private Onsite Sewage Works. Question Deadline 06/18/2026 at 2:00 PM MT Questions are submitted online Yes Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

GC Bidding

Water / Sewer

$300,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

July 24, 2026

Project location map

AB-62, Del Bonita, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.