Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work and new construction of an educational facility in Spanish Fork, Utah. Completed plans call for the construction of a 172,000-square-foot, two-story above grade educational facility; and for site work for a educational facility.

Nebo School District is seeking proposals from qualified vendors to provide commissioning services for the rebuild of Spanish Fork Junior High School. The project consists of a two-story, approximately 172,000-square-foot on-site replacement of the existing school, designed to accommodate approximately 1,200 students in 8th and 9th grades. Question Deadline 06/15/2026 at 2:00 PM MT All questions MUST be submitted through the Bonfire platform The scope of work includes , but is not limited to : Attending design meetings as requested by the NSD Design team . This may include the milestones of schematic design , design development and construction design . Vendor should plan on attending a minimum of 15 meetings . Reviewing design documents for commissioning -related aspects. This includes , but not limited to, reviews at design development , 90% construction documents , and 100% construction documents . A special emphasis will also be on the HVAC controls specifications . Define scope for on- site inspections during construction phases . Length of construction phase is estimated to be 36 months for Spanish Fork Jr. High School . Observation report distribution and follow - up . Developing a comprehensive commissioning plan o Conducting pre -functional and functional testing Providing systemperformanceverification o Ensuring compliance with energy codes and sustainability goals o Delivering final commissioning reports o Attend contractor trainings for district personnel One year and two -year follow -ups and complete recommissioning of systems after building completion . Please see included Attachment A which includes Spanish Fork Junior High School Drawing for reference . The mechanical systems will contain the following : o Rooftop AHU'S o VAV boxes Condensing Boilers o o Chillers o 4 pipe systems with Hot Water and Chilled Water pumps controlled by VFD's o BAS system

GC Bidding

Educational

$64,500,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
19
Bidding Soon
997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 17, 2026

Project location map

600 S 820 E, Spanish Fork, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.