BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2026 at 8:00 PM

Updated July 21, 2026

Renovation of a mixed-use development in Lakeville, Minnesota. Completed plans call for the renovation of a municipal facility; water / sewer project; and fire / police facility.

This is a single lump sum bid contract and includes removal of two existing boilers and primary and secondary hydronic pumps and accessories at the Lakeville Water Treatment Plant and replacement with two new Riello Boilers and associated primary and secondary pumps and associated hydronic piping specialties including expansion tank, air separator, chem shot feeder, and side stream filtration system. This includes all associated work including but not limited to demolition, electrical, piping, concrete, envelope, controls, etc. Removal of two existing boilers and three hydronic system pumps and accessories at the Lakeville Police Station and replacement with two new Riello Boilers and three associated hydronic system pumps and associated piping specialties including expansion tank, air separator, chem shot feeder, and side stream filtration system. This includes all associated work including but not limited to demolition, electrical, piping, concrete, envelope, controls, etc. Removal of existing air handling unit and associated condensing unit at the Lakeville Maintenance Facility and replacement with a new modular indoor air handling unit and multi-stage condensing unit and associated piping and accessories. This includes all associated work including but not limited to demolition, electrical, piping, concrete, envelope, controls, etc. Alternate 1 (ADD) includes removal of three hydronic system pump variable frequency drives (VFDs) at the Lakeville Police Station and replacement with three new VFDs. Alternate 2 (ADD) includes removal of two existing boilers and primary and secondary hydronic pumps at the Lakeville Water Treatment Plant with two new Riello Boilers and associated primary and secondary pumps and associated hydronic piping specialties including expansion tank, air separator, and chem shot feeder and side stream filtration system. This includes all associated work including but not limited to demolition, electrical, concrete, envelope, controls, etc. Bidders must submit bids electronically through QuestCDN, provide bid security in the amount of 5 percent of the Bid, and submit a signed statement verifying compliance with Minnesota Statutes section 16C.285, subdivision 3. The City reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contract in the best interests of the City. Locations-WATER TREATMENT PLANT 18400 IPAVA AVE, LAKEVILLE, MN 55044, POLICE DEPARTMENT 9237 183RD ST. W, LAKEVILLE, MN 55044, MAINTENANCE BUILDING 7570 179TH ST. W LAKEVILLE, MN 55044 Question Deadline 06/30/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Description of the Project: 1. Project includes mechanical systems upgrades at the City of Lakeville Water Treatment Facility, Police Station, and Maintenance Facility. Mechanical systems upgrades include but are not limited to the following: a. Removal and replacement of two existing boilers, two boiler pumps, and two system pumps at the Water Treatment Plant with two new Riello Boilers, new boiler pumps, and new system pumps. b. Removal and replacement of two existing boilers, and three system pumps at the Police Station with two new Riello Boilers, and three new system pumps. c. Removal and replacement of existing modular air handling unit and associated rooftop condenser at the Maintenance Facility with a new modular air handling unit and new rooftop condensing unit. d. Alternate 1 - Removal and replacement of three system pump VFDs with new VFDs at the Police Station. e. Alternate 2 - Removal and replacement of two existing boilers, two boiler pumps, and two system pumps at the Maintenance Facility with two new Riello Boilers, new boiler pumps, and new system pumps. f. All associated electrical work, mechanical work, structural modifications, and architectural modifications for a complete and operable system.

Bid Results

Water / Sewer

$1,138,000.00

Public - City

Renovation

35

15

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

August 21, 2026

Project location map

Multiple Locations, Lakeville, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.