Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Remodeling of an educational facility in Alcorn, Mississippi. Completed plans call for the remodel of a educational facility.

Sealed bids will be received electronically via MAGIC or physically delivered to the office of the Department of Facilities Management of Alcorn State University for Floor Replacement at Robinson Hall & Burrus Hall, Lorman Campus. Alcorn State University reserves the right to accept or reject any or all proposals/qualifications and to waive informalities. Specifications may be obtained from the Office of Facilities Management. EXISTING CONDITIONS IN ROBINSON HALL 1. Contractor will be responsible for all moving of furniture in dorms rooms. 2. Contractor must protect all furniture from damage. 3. Contractor must leave flooring material in condition area for at least 24 hours Before laying flooring. 4. Contractors will be required to prep all floors pry to lay flooring. 5. Contractors shall overlay new LVT planks over existing VCT tile. 6. Contractors will be responsible for any damage that occurs in the building that's Not there now. 7. Contractors will be responsible for their own trash dumpster. 8. Contractors will quote 102 rooms, total square footage per room is 208 square footage, grand total square footage is 21,215 square footages. 9. Contractors are required to reset all furniture back to its original form. 10. Contractors will be required to clean all glue from tile. 11. Tile to be used in dorm rooms: 12. TARKETT: L SUN TONED TEAK 7523 5X48 WW COLOR: SUNTONEDTEAK 13. Contractor shall install 4" cold base around all walls. EXISITING CONDITION IN BURRUS HALL: 1 Contractors will be responsible for all moving furniture in dorm rooms, hallways and lobby. 2. Contractors must protect all furniture from damage. 3. Contractors must leave flooring material in condition environment for at least 24 hours pry to laying floors. 4. Contractors will be required to prep all floors before laying floors. 5. Contractors shall overlay new LVT planks over existing VCT tile. 6. Contractors will be responsible for their own trash dumpster. 7. Any fill in tile (VCT) that's missing contractor will provide. 8. Contractor will reset all furniture to its original form. 9. Contractor shall clean all glue from floors. Tile to be used in dorm rooms TARKETT: L SUN TONED TEAK 7523 5X48 WW COLOR: SUNTONED TEAK 10. There are a total of 78 rooms on the west end of the building and 72 on the east end of the building. 11. There are a total of 150 rooms in the building one of these are an apartment for the worker, 149 of these rooms measure 16' 6"x12'= 199.2 sq.ft. Grand total sq. ft for rooms 29,608.8

Sub-Bidding

Educational

$500,000.00

Public - State/Provincial

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
30
Bidding Soon
498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2026

August 10, 2026

Project location map

Multiple Locations, Alcorn, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.