BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2026 at 8:00 PM

Updated July 13, 2026

Renovation of an educational facility in Glenview, Illinois. Completed plans call for the renovation of a educational facility.

Sealed bids are requested for the Avoca West 2026 North Boiler Replacement. Lump sum bid proposals will be received at the specified district administrative office and must be accompanied by a bid guarantee (Bid Bond, Certified Check, or Bank Draft) of at least ten percent of the bid, payable to Avoca School District 37. A performance bond and a labor and material payment bond in the full contract amount are required from the successful bidder. Bids should be submitted in an opaque sealed envelope clearly marked as SEALED BID. The Board of Education reserves the right to reject any or all bids or portions thereof or waive any irregularities or informalities. The contract is subject to the Illinois Prevailing Wage Act. Each bidder must satisfactorily complete the qualification process described in Section 004395 - General Requirements of the Project Manual by providing the required qualification documents with their sealed bid. The qualification documents will be available for public review and will be examined by the Owner and Architect to determine the lowest responsible bidder. Bidding documents, including drawings and project manuals, can be obtained electronically and reproduced at the bidder's expense from the designated reprographics company. A non-mandatory pre-bid walk-through for general contractors will be held at the Avoca West Elementary School, with subcontractors encouraged to attend. After the pre-bid meeting, site visitation is required to view the work area, gather additional information, and ask questions. There will be only one scheduled walk-through of the site. Submit requests for interpretation of the documents in writing to the Architect. Inquiries received two or more days prior to the date fixed for opening of the Bids will be given consideration. PROJECT DESCRIPTION A. The Project consists of the Boiler Replacement and Associated work at the Avoca West Elementary School for Avoca School District 37, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by Studio GC, dated June 04, 2026. B. Scope: The Work includes the work of all trades required; and all the labor, materials, and equipment necessary and incidental to the construction and completion of the Work. C. Work to be executed under one General Contract, including all trades

Bid Results

Educational

$189,880.00

Public - City

Renovation

6

10

5

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
652
Active Projects
3
Bidding Soon
4,636
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.