Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 10, 2026
Site work and paving for a road / highway in Cairo, New York. Working plans call for site work for a road / highway.
GENERAL REPAIRS: The sum of $730,000.00 shall be set aside to be expended for primary work and general repairs upon 91.5 miles of town highways, including sluices, culverts, trees and bridges having a span of less than five feet and boardwalks or the renewals thereof. PERMANENT IMPROVEMENTS: The following sums shall be set aside to be expended for the permanent improvement of Town Highways: a) On the road commencing at the Mahayan Temple and leading to County Rt 67, highway known as Ira Vail Road a distance of 1.6 miles, there shall be expended not over the sum of $150,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 b) On the road commencing at Ira Vail road and leading to Schoharie Turnpike, highway known as Deyo Road, a distance of .75 miles, there shall be expended not over the sum of $75,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 c) On the road commencing at Deyo road and leading to Indian Ridge road, highway known as Harold C Meyer Road for a distance of 1.48 miles, there shall be expended not over the sum of $190,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 d) On the road commencing at Ira Vail Road and leading to a dead end, highway known as Novack Road for a distance of .30 miles, there shall be expended not over the sum of $30,000.00. Type Black Top Width of traveled surface 16 wide Thickness 1.5 e) On the road commencing at Ira Vail Road and leading to a dead end, highway known as Spahmer Road for a distance of .35 miles, there shall be expended not over the sum of $36,000.00. Type Black Top Width of traveled surface 16 wide Thickness 1.5 f) On the road commencing at County Rt 31 and leading to Bald Hill Road, highway known as Blackhead Mountain Road for a distance of 1.02 miles, there shall be expended not over the sum of $95,000.00. Type Black Top Width of traveled surface 18 wide Thickness 1.5 g) On the road commencing at Blackhead Mountain Rd and leading to County Rt 31, highway known as Bald Hill Road North for a distance of 2.0 miles, there shall be expended not over the sum of $200,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 No specific instructions to bidders are present.
Final Planning
Roads / Highways
$730,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
Multiple Locations, Cairo, NY
Related To This Project
Cairo, NY
Bid Date: May 29 2026
Cairo, NY
Bid Date: May 29 2026
Cairo, NY
Bid Date: May 21 2026
Cairo, NY
Bid Date: Mar 17 2026
Cairo, NY
Bid Date: Apr 09 2026
Cairo, NY
Bid Date: Apr 09 2026
Cairo, NY
Bid Date: Apr 09 2026
Cairo, NY
Bid Date: Apr 09 2026
Cairo, NY
Bid Date: Feb 11 2026
Cairo, NY
Bid Date: Jan 30 2026
Cairo, NY
Bid Date: Nov 18 2025
Cairo, NY
Bid Date: Nov 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
