BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a road / highway in Cairo, New York. Working plans call for site work for a road / highway.

GENERAL REPAIRS: The sum of $730,000.00 shall be set aside to be expended for primary work and general repairs upon 91.5 miles of town highways, including sluices, culverts, trees and bridges having a span of less than five feet and boardwalks or the renewals thereof. PERMANENT IMPROVEMENTS: The following sums shall be set aside to be expended for the permanent improvement of Town Highways: a) On the road commencing at the Mahayan Temple and leading to County Rt 67, highway known as Ira Vail Road a distance of 1.6 miles, there shall be expended not over the sum of $150,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 b) On the road commencing at Ira Vail road and leading to Schoharie Turnpike, highway known as Deyo Road, a distance of .75 miles, there shall be expended not over the sum of $75,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 c) On the road commencing at Deyo road and leading to Indian Ridge road, highway known as Harold C Meyer Road for a distance of 1.48 miles, there shall be expended not over the sum of $190,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 d) On the road commencing at Ira Vail Road and leading to a dead end, highway known as Novack Road for a distance of .30 miles, there shall be expended not over the sum of $30,000.00. Type Black Top Width of traveled surface 16 wide Thickness 1.5 e) On the road commencing at Ira Vail Road and leading to a dead end, highway known as Spahmer Road for a distance of .35 miles, there shall be expended not over the sum of $36,000.00. Type Black Top Width of traveled surface 16 wide Thickness 1.5 f) On the road commencing at County Rt 31 and leading to Bald Hill Road, highway known as Blackhead Mountain Road for a distance of 1.02 miles, there shall be expended not over the sum of $95,000.00. Type Black Top Width of traveled surface 18 wide Thickness 1.5 g) On the road commencing at Blackhead Mountain Rd and leading to County Rt 31, highway known as Bald Hill Road North for a distance of 2.0 miles, there shall be expended not over the sum of $200,000.00. Type Black Top Width of traveled surface 20 wide Thickness 1.5 No specific instructions to bidders are present.

Final Planning

Roads / Highways

$730,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
282
Bidding Soon
3,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

Multiple Locations, Cairo, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.