Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a playground / park / athletic field in Pleasanton, California. Completed plans call for site work for a playground / park / athletic field.

The project aims to convert approximately 2.5 acres of nonfunctional turf across 10 locations within the city to mulch or drought-tolerant plantings, including bid alternates for up to 8 additional sites. The work consists of clearing and grubbing existing turf areas, erosion control, irrigation, and landscape improvements to convert the non-functional turf to low water-use plants and/or mulch. Bidders must adhere to the latest versions of bid documents as amended, with plans available for purchase or at no charge online. Interested parties should request to be added to the plan holder list to receive addenda. Questions are to be directed to the project engineer and will be answered by reference to specific sections of the bid documents, with clarifications issued by addenda as necessary. Questions are only accepted prior to seven calendar days before the bid opening date. Question Deadline 06/17/2026 Questions should be directed to Matt Gruber, Project Engineer either in-person at 200 Old Bernal Avenue, Pleasanton, California, by mail at P.O. Box 520, Pleasanton, California 94566-0802, by phone at (925) 931-5672, or by email at mgruber@cityofpleasantonca.gov. To allow time for issuance of addenda, questions shall only be accepted prior to seven (7) calendar days before the bid opening date. The work consists of clearing and grubbing existing turf areas, erosion control, irrigation, and landscape improvements to convert the non-functional turf to low water-use plants and/or mulch at various City-owned properties throughout the City. Bid Item #1: Amador Valley Community Park The lump sum price paid for Amador Valley Community Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Amador Valley Community Park - Phase 1/Base Bid, complete in place, including project start up, demolition, and irrigation as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #2: Bicentennial Park The lump sum price paid for Bicentennial Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Bicentennial Park - Base Bid/Phase 1, complete in place, including project start up, demolition, irrigation, and decomposed granite pavement, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #3: Centennial Park The lump sum price paid for Centennial Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Centennial Park - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #4: Civic Center The lump sum price paid for Civic Center - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Civic Center - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #5: Pleasanton Police Department The lump sum price paid for Pleasanton Police Department - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Pleasanton Police Department - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #6: Fire Station No. 1 The lump sum price paid for Fire Station No. 1 - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Fire Station No. 1 - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #7: Fire Station No. 2 The lump sum price paid for Fire Station No. 2 - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Fire Station No. 2 - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #8: Kottinger Community Park The lump sum price paid for Kottinger Community Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Kottinger Community Park - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting, decomposed granite and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #9: Nielsen Park The lump sum price paid for Nielsen Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Nielsen Park - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer. Bid Item #10: Orloff Park The lump sum price paid for Orloff Park - Phase 1/Base Bid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Orloff Park - Phase 1/Base Bid, complete in place, including project start up, demolition, irrigation, soil preparation, planting and landscape maintenance, as shown on the plans, as specified in the Specifications and these special provisions, and as directed by the Engineer.

Sub-Bidding

Playgrounds / Parks / Athletic Fields

$889,000.00

Public - City

Site Work

55

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
507
Active Projects
89
Bidding Soon
3,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.