BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 3, 2026

Renovation of a detention facility in Schenectady, New York. Completed plans call for the renovation of a detention facility.

Question Acceptance Deadline 06/25/2026 02:00 PM EDT Questions should be submitted to purchasing@schenectadycountyny.gov. The work consists of the Schenectady County Jail Roof Replacement located at 320 Veeder Ave., Schenectady, NY 12307, with one prime contract. Bidders must submit their proposals in a sealed envelope marked with the project name and contract number to the Purchasing Agent by the specified due date. Bid Security must be included as described in the General Instructions to Bidders. The County may investigate bidders' responsibility and reserves the right to reject any bid if the bidder is deemed incapable of meeting contract obligations, as well as to waive any informality or reject all bids. Woman and minority owned businesses are encouraged to submit proposals. All interested parties may access digital specifications from BidNet Direct or request paper copies in advance from the Purchasing Department. There will be a pre-bid walkthrough at the project site. The Work consists of the following: 1. The work of the proposed Contract shall comprise the furnishing of all labor, materials, equipment, and incidentals as necessary to complete ALL the work specified herein and shown on the Contract Drawings. References to codes, specifications and standards called for in the specification sections and on the drawings mean, the latest edition, amendment, and revision of such referenced standard in effect on the date of these contract documents. All materials and equipment shall be installed in accordance with the manufacturer's recommendations. 2. Contractors will be required to prepare, submit, and actively implement a proper safety program throughout the duration of the project. Provide all necessary safety equipment for his own work at all individual locations as may be applicable. 3. Contractors to provide all submittals, drawings, coordination drawings, and samples as required. 4. Contractors to provide all necessary permits, inspections, approvals, testing, and pay all required fees to complete this scope of work. 5. Existing Facility will be in full operation during the progression of this project. 6. Contractors to provide temporary toilet facilities at general locations throughout the project site as to provide convenience and accessibility to all craft and for the use of all bid packages. 7. Contractors to provide all dumpsters for all work. Contractor is responsible for the provision of containers and the removal of all waste, non-returned surplus materials, and rubbish from the site. Each subcontractor shall be responsible for collecting, sorting, and depositing in designated areas, their waste, non-returned surplus materials, and rubbish. 8. Contractor is expected to review all the plans and specifications as it may affect their work and/or trade jurisdiction and to include in their proposal all costs necessary to make connections with or coordinate with those requirements whether expressly stated therein or implied. This is to include but not be limited to tie-ins to existing construction, etc. 9. Contractors to comply with ASSE A10.6 and NFPA 241 for all demolition and removals required as set forth in the project drawings. 10. Contractor shall restore all lawn, sidewalks, blacktop, concrete, curbs, and planting areas disrupted in the performance of work. 11. Daily cleaning as directed by the Owner's representative will be a mandatory requirement. 12. Contractor to provide protection, repair all damage, and final cleaning of all work of this scope as laid out in the project documents until owner acceptance. 13. Contractors shall clean up their own debris daily and remove it from the site each Friday as a minimum. 14. Broom clean paved surfaces: rake clean other surfaces and grounds. 15. Clean all floors, walls, glass, and finish surfaces at construction areas. All areasshall be vacuum cleaned and dust free. Equipment and furniture shall be free of construction dust and stains.

Bid Results

Jails / Prisons

$841,811.00

Public - County

Renovation

10

13

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
147
Bidding Soon
2,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

August 11, 2026

Project location map

320 Veeder Ave, Schenectady, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.