BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a road / highway in New Hartford, New York. Completed plans call for site work for a road / highway.

The project consists of the replacement of a 4-way span wire-mounted signal system with a 2-pole/mast arm system. Specifically, the work includes installation of 4 pole-mounted mast arms on 2 new poles with concrete foundations, 8 mast arm-mounted signal heads, 11 mast arm-mounted signs, a camera video detection system, and replacement of the pole-mounted signal controller and cabinet with a ground-mounted system, including a battery backup. The contractor is required to maintain the current signal system and traffic flow until project completion. Bidders must obtain the full set of Bidding Documents from the designated issuing office and follow all requirements regarding bid submittal, qualifications, procedures, and contract award as provided in the Instructions to Bidders included in the Bidding Documents. The project is subject to all applicable state and local laws and regulations, including payment of New York State Department of Labor Prevailing Wage Rates. The Town of New Hartford reserves the right to waive irregularities and to reject any or all bids.

GC Bidding

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
122
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

August 21, 2026

Project location map

8635 Clinton Street, New Hartford, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.