BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 26, 2026

Renovation of an educational facility in Englewood, Colorado. Working plans call for the renovation of a educational facility.

Reference Number 0000427189 Question Deadline 06/18/2026 at 2:00 PM MT Questions are submitted online. Note: For any questions or requests for clarification regarding this RFP, please submit them in writing via email to Ariel Ramos, Director of Operations and Maintenance, at Ariel_Ramos@engschools.net This project aims to secure a reliable and experienced partner to perform specialized interior remediation and component replacement, ensuring the continued efficiency and longevity of the facility's cooling infrastructure. Englewood Schools - Arapahoe County School District #1 is seeking proposals from qualified mechanical contractors for the refurbishment and repair of an existing cooling tower at the Englewood Campus. The project involves a comprehensive overhaul of one (1) BAC Model 15385 Cooling Tower (S/N U135117401-01). The scope includes the removal of internal fill and basins, surface preparation and grinding of the cold water basin, application of a cooling tower grade liner, and the installation of new high-efficiency fill media and hot water basins. A crucial component of this project is the precision application of the liner and the successful return of the unit to service for campus operations. The selected contractor will be responsible for the following: Permits and Fees: Obtaining all necessary permits and paying associated fees. Safety Protocols: Perform full lockout/tagout (LOTO) procedures prior to work. Demolition & Removal: Remove existing fill media, hangers, supports, hot water basins, and nozzles. Waste Management: Dispose of all old materials in a contractor-supplied dumpster (Sys-Kool or equivalent). Component Retention: Carefully remove, store, and reinstall existing screens and louvers. Surface Preparation: Clean, prep, and grind the cold water basin and interior side walls at all water-touch areas. Steel Repair: Apply patch steel as needed to approximately 3-4 small identified areas. Liner Installation: Apply a cooling tower-grade liner to all prepped interior surfaces. New Installation: Furnish and install new bottom-supported fill media and a new hot-water basin, equipped with heavy-duty covers and new nozzles. System Restoration: Remove locks and return the cooling tower to the owner in ready-to-run condition for startup. Inclusive Pricing: All pricing must include labor, supervision, tools, materials, and warranty for the work performed.

Final Planning

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
130
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

January 11, 2027

Project location map

3800 S Logan St, Englewood, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.