BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2026 at 8:00 PM

Updated July 8, 2026

Site work for a road / highway in Fountain, Colorado. Completed plans call for site work for a road / highway.

Reference Number 0000427181 Construction of Ohio Avenue and Jimmy Camp Road Traffic Signal Construction Improvements. Question Deadline 06/17/2026 at 10:30 AM MT Any questions regarding this bid should be directed to Scott Asher, Project Manager, email: scott.asher @wilsonco.com or 719-302-6743. Questions are submitted online No The new Ohio Avenue / Jimmy Camp Road Traffic Signal is located in the intersection. There will be minor roadway widenings, Slurry Seal Resurfacing, Striping, and signing for the new traffic signal improvements. The project is designed using City of Fountain and Colorado Department of Transportation specifications for both roadway and utility requirements. The new traffic signal caissons will have to be carefully placed between existing utilities located along Ohio Avenue and Jimmy Camp Road. All the caissons will be required to be hydro-vac excavated to ensure safety of the existing utility lines paralleling the caisson location. We currently have a no work zone for the NW caisson location due to right of way acquisition timing. We expect the project to be constructed in 2-pahses. Phase 1 will be placing the poles in the NE. SW, and SE quadrants with signals be installed on the diagonal from the SW to NE. This phase will need to be complete prior to school starting in mid-august 2026. Phase 2 will be installing the caisson and pole in the NW quadrant and resetting the signals in the final locations. The contractor should anticipate 2 mobilizations to complete the project. There is a Middle School and High School located south of Ohio Street which makes the intersection meet the warrants for traffic signal installation. The City has acquired the Traffic Signal Poles anchor bolts, mounting hardware and Traffic Controller to ensure that the construction is completed during School Summer Break schedule. School will resume operation mid-August 2026. The contractor will need to procure the span wire cable to complete the signal installation.

Bid Results

Roads / Highways

$449,605.00

Public - City

Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
13
Bidding Soon
1,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

July 22, 2026

Project location map

Jimmy Camp Rd & E Ohio Ave, Fountain, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.