BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 16, 2026

Demolition, site work and new construction of a playground / park / athletic field in Greenfield, Tennessee. Completed plans call for the demolition of a playground / park / athletic field; and for the construction of a playground / park / athletic field.

Furnish all material, equipment, supplies, and labor necessary to remove the existing playground and install a new commercial playground at Big Cypress Tree State Park. Order the project by square footage. Hard copy sets of specifications are available for purchase, or files may be downloaded for free from the online plan room. For questions about accessing the documents, contact Memphis Reprographics at 901-590-4862. Question Deadline 06/22/2026 at 2:00 PM CT All questions must be submitted Online. 1. The Contractor shall prepare designated playground area for installation of new equipment. This includes removal of existing playground, topsoil, grade work to level site, and a four (4) inch gravel base. The site shall have a one percent (1%) slope to allow for proper drainage. The Contractor shall compact any fill-in areas appropriately. 2. The Contractor shall provide and install composite multi-level tower playground structure consistent with the attached site plan. 3. The Contractor shall provide and install a four (4) seat swing frame, that is eight (8) feet high. 4. The Contractor shall provide and install an ADA full ramp system providing accessible entry. 5. The Contractor shall provide and install ancillary play components including Custom Triple Tower Wackle, Custom Sign, ADA Full Ramp, Custom Swing, Agora Bench and associated play features as reflected in the attached site plan. 6. The Contractor shall provide and install approximately 58 pieces of twelve (12) inch plastic playground border system. 7. The Contractor shall provide and install approximately two thousand six hundred and forty (2,640) square feet of engineered wood fiber (EWF) surfacing at twelve (12) inch compacted depth with one (1) layer of filter fabric, in accordance with manufacturer and safety standards. The EWF shall conform with ASTM F2075, ASTM F1292, and ASTM F1951 standards. 8. The Contractor shall install all support posts encased in concrete per manufacturer requirements. 9. The Contractor shall provide a complete installation including equipment assembly, surfacing placement, finish grading, and final site cleanup. 10. Final layout orientation and placement within the approved footprint shall be confirmed at the pre-construction meeting.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
27
Bidding Soon
744
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2026

August 23, 2026

Project location map

295 Big Cypress Rd, Greenfield, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.