Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 28, 2026 at 8:00 PM
Updated July 29, 2026
Site work and paving for a mixed-use development in Cincinnati, Ohio. Completed plans call for site work for a transportation facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Southwest Ohio Regional Transit Authority (SORTA), commonly known as Metro, is soliciting proposals from qualified contractors to provide bus stop shelter installation services across its service area, which includes Hamilton County and portions of Warren, Butler, and Clermont counties. Question Deadline 06/24/2026 at 2:00 PM ET Any questions regarding this solicitation shall be submitted through the e-Procurement Portal. Telephoned questions will not be accepted. Proposers shall not contact any other SORTA personnel regarding any aspect of this solicitation. Any proposer found to have had such contact shall be barred from participation in this solicitation and any subsequent contract, either as a prime contractor or subcontractors. SORTA anticipates that responses to questions submitted will be provided to all known proposers by 4:00 pm on Wednesday, July 1, 2026. If the responses materially alter the terms of this solicitation, they will be incorporated in an amendment to the solicitation. No communication by SORTA or any of its Trustees, officers, employees, agents or representatives shall alter the terms of this solicitation or bind SORTA in any manner, unless incorporated in such an amendment. PHASE ONE - BUS STOP ENHANCEMENTS (51 Locations) Phase One includes the installation of 51 bus shelters across multiple jurisdictions in Hamilton County (see Figure 1). An additional set of 51 locations has been designated as alternates should site constraints prevent installation at primary locations. Sites will vary in ROW conditions, ground conditions, and accessibility requirements.BUS SHELTER DESIGN REQUIREMENTS To maintain consistent branding and ensure efficient use of public right-of-way, Metro will purchase two (2) types of Tolar shelter models. o Shelters will be drop shipped to the awarded vendor for storage. o Shelter procurement will be scheduled based on the approved PMP and installation schedule. o Current lead time from manufacturer, approximately five (5) months. o Shelters are shipped from the manufacturer in full truck load quantities, 15 shelters/truck(total of 4 shipments). o Shelters are shipped FOB destination from manufacturer. o Awarded contractor will store shelters in alignment with approved installation schedule. Procurement of Shelters will be determined upon award. o Pricing will include two (2) options: o Option #1-SORTA to purchase the shelters and ship directly to the awarded contractor;o Option #2-Contractor will purchase shelters. Tolar 10' AD Custom Dome Shelter w/Bench o Model ID: 29187-01 o With advertising panel (see Figure 2) Tolar 16' Sunset Shelter w/Bench o Model ID: 39794-00 (see Figure 3) SORTA has determined that subcontracting opportunities for small businesses are not available under this solicitation. Therefore, a formal small business participation goal is not recommended.
Post-Bid
Transportation Terminals
$3,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2026
September 11, 2026
Multiple Locations, Cincinnati, OH
Related To This Project
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 25 2026
Cincinnati, OH
Bid Date: Jun 23 2026
Cincinnati, OH
Bid Date: Jul 22 2026
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 23 2026
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 25 2026
Cincinnati, OH
--
Cincinnati, OH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
