BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a water / sewer project in Avon Park, Florida. Conceptual plans call for site work for a water / sewer project.

The selected engineering firm shall provide professional engineering services for the City of Avon Park's Sanitary Sewer Collection System Hardening Project (Project No. MS014), funded through the Community Development Block Grant-Disaster Recovery (CDBG-DR) program. The project aims to address storm-related damage to the sanitary sewer collection system, reduce inflow and infiltration (I&I), improve system resilience during hurricanes and extreme rainfall events, reduce the risk of sanitary sewer overflows, and extend the useful life of critical wastewater infrastructure. Engineering services include project management, coordination with City staff and grant administrators, field investigations, televised inspection review, condition assessment of approximately 214,500 linear feet of sanitary sewer lines and 845 manholes, preparation of engineering reports and recommendations, design and construction documents for cured-in-place pipe (CIPP) lining, sewer rehabilitation, and replacement of approximately 8,000 linear feet of severely deteriorated sewer mains where rehabilitation is not feasible. Services also include permitting assistance, bid-phase support, construction administration, construction observation, record drawings, and project closeout documentation as required for compliance with CDBG-DR program requirements and applicable federal, state, and local regulations. The selected consultant will collaborate with contracted grant management firms, construction contractors, and City staff throughout all project phases. Construction will commence after final design, environmental review clearance, receipt of Authority to Use Grant Funds, and completion of the procurement process for construction services. Instructions include that all questions must be submitted in writing to the Purchasing Agent, and proposers are responsible for checking for and acknowledging all addenda. Proposals must comply with all specified terms and conditions and may be subject to rejection if they do not conform.

Conceptual

Water / Sewer

$20,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

August 24, 2026

Project location map

To be determined, Avon Park, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.