Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2026 at 8:00 PM
Updated August 13, 2026
Demolition, site work and new construction of a water / sewer project in Austin, Texas. Completed plans call for the demolition of a water / sewer project.
Demolish existing Headworks and construct a replacement Headworks. The new Headworks will increase screening capacity, provide odor control, and replace critical screening and electrical infrastructure that are severely corroded and unsafe. The Work consists of the following improvements: o Demolition of the existing headworks facility structure and installation of a new covered structure adjacent to the Flow Equalization Basin (FEB). o Installation of two (2) new multi-rake bar screens, washer/compactors, a dumpster, and a bypass channel to replace the existing headworks facility equipment. o Modification of existing gravity belt thickeners. o Installation of magnetic flow meters and air release valves on all influent lines, located in two separate cast in place vaults. o Installation of a biotrickling filter to treat the headworks' foul air stream. o Installation of a receiving station with a quick connect for sludge delivered by AW trucks and secondary containment. o Installation of a new electrical room inside the CoGen Building to house new Motor Control Centers (MCCs) and Programmable Logic Controller (PLC). o Installation of a new electrical room inside the FEB Building to house new MCCs, PLCs, transformers, and control panels. o Installation of a dedicated control room inside the FEB building to house an HMI workstation, PLC, network rack and security rack. o Replacement of the switchgear on the exterior of the CoGen Building. o Installation of new duct bank from the CoGen Building to the FEB Building. o Replacement of existing electrical equipment in the FEB Building, including MCCs and a PLC in the converted boiler room and expanded control room, respectively. o Improvements to the HVAC systems for the headworks facility, CoGen Building, and FEB Building. o Improvements to the security system for the CoGen Building and FEB Building.
Bid Results
Water / Sewer
$20,382,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2026
October 5, 2026
2210 FM973, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jul 01 2026
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jun 17 2026
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
