BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 13, 2026

Demolition, site work and new construction of a water / sewer project in Austin, Texas. Completed plans call for the demolition of a water / sewer project.

Demolish existing Headworks and construct a replacement Headworks. The new Headworks will increase screening capacity, provide odor control, and replace critical screening and electrical infrastructure that are severely corroded and unsafe. The Work consists of the following improvements: o Demolition of the existing headworks facility structure and installation of a new covered structure adjacent to the Flow Equalization Basin (FEB). o Installation of two (2) new multi-rake bar screens, washer/compactors, a dumpster, and a bypass channel to replace the existing headworks facility equipment. o Modification of existing gravity belt thickeners. o Installation of magnetic flow meters and air release valves on all influent lines, located in two separate cast in place vaults. o Installation of a biotrickling filter to treat the headworks' foul air stream. o Installation of a receiving station with a quick connect for sludge delivered by AW trucks and secondary containment. o Installation of a new electrical room inside the CoGen Building to house new Motor Control Centers (MCCs) and Programmable Logic Controller (PLC). o Installation of a new electrical room inside the FEB Building to house new MCCs, PLCs, transformers, and control panels. o Installation of a dedicated control room inside the FEB building to house an HMI workstation, PLC, network rack and security rack. o Replacement of the switchgear on the exterior of the CoGen Building. o Installation of new duct bank from the CoGen Building to the FEB Building. o Replacement of existing electrical equipment in the FEB Building, including MCCs and a PLC in the converted boiler room and expanded control room, respectively. o Improvements to the HVAC systems for the headworks facility, CoGen Building, and FEB Building. o Improvements to the security system for the CoGen Building and FEB Building.

Bid Results

Water / Sewer

$20,382,000.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
144
Bidding Soon
3,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

October 5, 2026

Project location map

2210 FM973, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.