Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Demolition, site work and new construction of a bridge / tunnel in Seguin, Ontario. Completed plans call for the demolition of a bridge / tunnel.
The Township of Seguin requires a new steel bridge with timber decking supported with timber bearing pads to be installed on the Seguin Trail between Highway 518 and Nipissing Road East. The scope for these works includes: Provide traffic and environmental controls throughout the duration of the project. Removal and disposal of the existing bridge superstructure, sub structure to remain in place to ensure no in water work. Supply and install timber bearing pads Supply and install new 33.53m (110') steel bridge complete with a timber deck Add new fill and grade new east and west approaches. Supply and install rip rap at water's edge and along the bridge slope. Additionally, prices for the following provisional items should be included: Contingency allowance of $25,000. No bonding will be required as part of this contract. A 10% statutory holdback and a 3% maintenance holdback will be required. Question Deadline 06/19/2026 at 12:00 PM ET Documents are available at https://www.biddingo.com/
Sub-Bidding
Bridges / Tunnels
$1,000,000.00
Public - City
Demolition, New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2026
August 7, 2026
Seguin Trail between Highway 518 and Nipissing Road East, Seguin, ON
Related To This Project
Seguin, ON
Bid Date: Mar 19 2026
Seguin, ON
Bid Date: Jan 09 2026
Seguin, ON
Bid Date: Dec 10 2025
Seguin, ON
--
Seguin, ON
Bid Date: Sep 29 2025
Seguin, ON
Bid Date: Apr 04 2025
Seguin, ON
--
Seguin, ON
Bid Date: Mar 28 2025
Seguin, ON
Bid Date: Mar 07 2025
Seguin, ON
Bid Date: Feb 11 2025
Seguin, ON
Bid Date: Oct 17 2024
Seguin, ON
Bid Date: Oct 03 2024
Seguin, ON
Bid Date: Oct 04 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
