BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 6, 2026

Site work for a water / sewer project in Wauwatosa, Wisconsin. Completed plans call for site work for a water / sewer project.

The project consists of demolition of existing trees, rootballs, pavements, foundations, and floodwalls; excavation and off-site landfilling of approximately 1,075 cubic yards of soils; construction of approximately 1,760 feet of an existing earthen levee raise; construction of approximately 750 linear foot concrete floodwall cap extension (raises); maintenance repairs to existing concrete floodwalls including spalling of concrete, crack formation and expansion sealing, construction joint sealant material damage, and waterstop damage repair; construction of approximately 325 feet of permanent two-rail timber fence; construction of approximately 96 feet of 30-inch RCP storm sewer and appurtenances; installation of 30-inch storm sewer outfall structure and flap gate; construction of 90 feet of 8-inch PVC sanitary sewer; installation of two new sanitary sewer manholes along the new 8-inch PVC sanitary sewer line; adjustment of the grade of one existing City of Wauwatosa sanitary sewer manhole; installation of a cast-in-place concrete backflow prevention structure and in-line check valve within the 72-inch storm sewer; adjustment of the grade of two City of Wauwatosa storm manholes along the 72-inch storm sewer; installation of two manholes over the Schoonmaker Creek double box culvert; construction of approximately 300 feet of an access ramp at Schoonmaker Creek outfall; concrete pavement, asphalt, turf, and native vegetative restoration of all disturbed areas; and a 5-year post-construction vegetation maintenance period for disturbed areas adjacent to Honey Creek Parkway. Vendor Engagement/ Live QA Meeting June 24, 2026 @10:00am over Teams Register by emailing Millie at eneidhardt@mmsd.com Question Deadline 07/10/2026 at 10:00 AM CT Bidders must agree to comply with the LOCAL WORKFORCE PARTICIPATION requirements stated in the REQUIREMENTS FOR BIDDERS of these Contract Documents. For further information or questions regarding these requirements, please contact the Districts procurement office, Robert Williams, at rwilliams@mmsd.com.

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
135
Bidding Soon
2,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

September 29, 2026

Project location map

7300 W Chestnut St, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.