Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 6, 2026
Site work for a water / sewer project in Wauwatosa, Wisconsin. Completed plans call for site work for a water / sewer project.
The project consists of demolition of existing trees, rootballs, pavements, foundations, and floodwalls; excavation and off-site landfilling of approximately 1,075 cubic yards of soils; construction of approximately 1,760 feet of an existing earthen levee raise; construction of approximately 750 linear foot concrete floodwall cap extension (raises); maintenance repairs to existing concrete floodwalls including spalling of concrete, crack formation and expansion sealing, construction joint sealant material damage, and waterstop damage repair; construction of approximately 325 feet of permanent two-rail timber fence; construction of approximately 96 feet of 30-inch RCP storm sewer and appurtenances; installation of 30-inch storm sewer outfall structure and flap gate; construction of 90 feet of 8-inch PVC sanitary sewer; installation of two new sanitary sewer manholes along the new 8-inch PVC sanitary sewer line; adjustment of the grade of one existing City of Wauwatosa sanitary sewer manhole; installation of a cast-in-place concrete backflow prevention structure and in-line check valve within the 72-inch storm sewer; adjustment of the grade of two City of Wauwatosa storm manholes along the 72-inch storm sewer; installation of two manholes over the Schoonmaker Creek double box culvert; construction of approximately 300 feet of an access ramp at Schoonmaker Creek outfall; concrete pavement, asphalt, turf, and native vegetative restoration of all disturbed areas; and a 5-year post-construction vegetation maintenance period for disturbed areas adjacent to Honey Creek Parkway. Vendor Engagement/ Live QA Meeting June 24, 2026 @10:00am over Teams Register by emailing Millie at eneidhardt@mmsd.com Question Deadline 07/10/2026 at 10:00 AM CT Bidders must agree to comply with the LOCAL WORKFORCE PARTICIPATION requirements stated in the REQUIREMENTS FOR BIDDERS of these Contract Documents. For further information or questions regarding these requirements, please contact the Districts procurement office, Robert Williams, at rwilliams@mmsd.com.
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2026
September 29, 2026
7300 W Chestnut St, Wauwatosa, WI
Related To This Project
Wauwatosa, WI
Bid Date: Jul 31 2026
Wauwatosa, WI
Bid Date: Jul 15 2026
Wauwatosa, WI
--
Wauwatosa, WI
--
Wauwatosa, WI
Bid Date: Jul 20 2026
Wauwatosa, WI
--
Wauwatosa, WI
--
Wauwatosa, WI
Bid Date: Sep 22 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
