BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work and paving for a civil project in Port Huron, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work consists of furnishing all labor, material, and equipment required for road reconstruction including pavement removal, utility replacement, resurfacing asphalt pavement, storm sewer, and lawn restoration along Conner Street between Military Street and Electric Avenue as shown on the Drawings or specified in the Project Manual . A certified check payable to the City of Port Huron, or a satisfactory bid bond executed by the bidder and a surety company, in the amount equal to five percent(5%) of the bid, shall be submitted with each bid . Question Deadline 06/18/2026 at 4:30 PM ET Questions are submitted online No The successful bidder will be required to furnish satisfactory performance, labor and materials bonds, maintenance and guarantee bonds, and insurance certificates. The City of Port Huron reserves the right to reject any or all bids, to waive any defects or irregularities in the bid, and to accept any bid which is deemed most advantageous to the said City's interests.

GC Bidding

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
195
Bidding Soon
2,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

July 27, 2026

Project location map

Conner St, Port Huron, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.