BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Renovation of a clubhouse / community center in Clinton, Tennessee. Completed plans call for the renovation of a clubhouse / community center.

Reference Number 0000427400 The facility has a Main Assembly Room that is approximately 2,200 square feet and has a capacity to comfortably seat 200 individuals. This space serves multiple purposes including as a cafeteria for ETHRA meals five days a week, a Bingo "Hall," a venue for Health Education Presentations and a Choir room. Programs are presented on a wall-mounted television. Daily attendance at the Senior Center averages 60 people with special events attracting 80 to 125 seniors several times a month. Sounds from presentations, group and individual activities and conversations, the HVAC system and kitchen and janitorial activities create varying noise levels. The Main Assembly Room has high ceilings averaging 14' with exposed structure of concrete or steel deck. Surface areas have finishes of vinyl floor, drywall and glass. The room currently does not have noise absorption. Noise reverberates throughout the room and carries into other areas of the facility. These acoustics hinder the ability to hear conversations, presentations and music. Anderson County seeks quotes for the purchase and installation of sound absorption materials to lower Reverberation Time. The acoustic design shall include treatment on the ceiling and a modest amount of treatment on the walls to minimize lateral reflections which can be perceived as "flutter echo." The solution shall achieve a target Reverberation Time (RT) of 0.8 seconds, with a maximum target not to exceed RT 1.3 seconds. The project will employ a solution at the ceiling level that includes Deck Hanging Kits, as well as installation of wall panels. While aesthetics is not the primary goal of the acoustical project, Anderson County will choose colors, textures and shapes of the acoustical materials that will improve the visual environment and remove the current "institutional" look. Installation timeline is within 3 - 4 months.

Sub-Bidding

Clubhouse / Community Centers

$50,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
75
Bidding Soon
989
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2026

July 29, 2026

Project location map

96 Mariner Point Dr, Clinton, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.