Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 12, 2026 at 8:00 PM
Updated June 13, 2026
Renovation of a clubhouse / community center in Clinton, Tennessee. Completed plans call for the renovation of a clubhouse / community center.
Reference Number 0000427400 The facility has a Main Assembly Room that is approximately 2,200 square feet and has a capacity to comfortably seat 200 individuals. This space serves multiple purposes including as a cafeteria for ETHRA meals five days a week, a Bingo "Hall," a venue for Health Education Presentations and a Choir room. Programs are presented on a wall-mounted television. Daily attendance at the Senior Center averages 60 people with special events attracting 80 to 125 seniors several times a month. Sounds from presentations, group and individual activities and conversations, the HVAC system and kitchen and janitorial activities create varying noise levels. The Main Assembly Room has high ceilings averaging 14' with exposed structure of concrete or steel deck. Surface areas have finishes of vinyl floor, drywall and glass. The room currently does not have noise absorption. Noise reverberates throughout the room and carries into other areas of the facility. These acoustics hinder the ability to hear conversations, presentations and music. Anderson County seeks quotes for the purchase and installation of sound absorption materials to lower Reverberation Time. The acoustic design shall include treatment on the ceiling and a modest amount of treatment on the walls to minimize lateral reflections which can be perceived as "flutter echo." The solution shall achieve a target Reverberation Time (RT) of 0.8 seconds, with a maximum target not to exceed RT 1.3 seconds. The project will employ a solution at the ceiling level that includes Deck Hanging Kits, as well as installation of wall panels. While aesthetics is not the primary goal of the acoustical project, Anderson County will choose colors, textures and shapes of the acoustical materials that will improve the visual environment and remove the current "institutional" look. Installation timeline is within 3 - 4 months.
Sub-Bidding
Clubhouse / Community Centers
$50,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2026
July 29, 2026
96 Mariner Point Dr, Clinton, TN
Related To This Project
Clinton, TN
Bid Date: Jun 18 2026
Clinton, TN
Bid Date: May 08 2026
Clinton, TN
Bid Date: Apr 24 2026
Clinton, TN
Bid Date: Jun 11 2026
Clinton, TN
Bid Date: Apr 20 2026
Clinton, TN
Bid Date: Mar 30 2026
Clinton, TN
Bid Date: Mar 27 2026
Clinton, TN
Bid Date: Mar 27 2026
Clinton, TN
Bid Date: Mar 16 2026
Clinton, TN
Bid Date: Mar 20 2026
Clinton, TN
Bid Date: Mar 20 2026
Clinton, TN
Bid Date: Mar 20 2026
Clinton, TN
Bid Date: Mar 17 2026
Clinton, TN
Bid Date: Feb 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
