Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 22, 2026 at 8:00 PM
Updated July 27, 2026
Site work for a power facility in Bruceton Mills, West Virginia. Completed plans call for site work for a power facility.
High voltage power construction at Coopers Rock. Question Deadline 07/01/2026 at 4:00 PM ET Questions to: Josh hager 2019 Washington Street, East Charleston, WV 25305 Fax: (304) 558-3970 email Joseph hagerlll@w.gov GENERAL SUMMARY: Horizontal Directional Drill and Conduit Installation: The Coopers Rock State Forest electric is served by a single phase, single conductor 7.2KV which originates on the North side of I68, at the Park Office and proceeds overhead to an underground crossing point installed as part of the original construction of I68. The steel conduit is suspect and its failure or poor condition could leave the majority of the Forest without power until a replacement conduit was installed. As such, and in preparation for an overhead lines replacement project, new conduit(s) must be installed to follow in the path and right of way of the original conduit. Generally, this project is to perform a horizontal direction drill, utilizing a remote, tracked, steerable horizontal drill head, followed by a conduit pullback under I68 and County Route 73/73. Both the starting and ending points occur outside the WVDOH right of way, on Forest property. The drill will be continuous under both roadways with an approximate length of 500 feet, point to point and not accounting for elevation changes. Primary access to the North bore pit will be by the right of way on forest property and disruption of traffic on County Route 73/73 will be minimized. Should it have to be utilized, the Vendor will provide any traffic control required by WVDOH on County Route 73/73, including any planning required, as part of the bid, to meet WVDOH requirements. The base bid project will install 2 - 6" SDR 9 HDPE conduit conduits in parallel.
Post-Bid
Power Plant
$500,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
October 19, 2026
61 County Line Dr, Bruceton Mills, WV
Related To This Project
Bruceton Mills, WV
Bid Date: Aug 21 2026
Bruceton Mills, WV
Bid Date: Oct 13 2026
Bruceton Mills, WV
--
Bruceton Mills, WV
--
Bruceton Mills, WV
Bid Date: Sep 04 2026
Bruceton Mills, WV
Bid Date: Nov 17 2026
Bruceton Mills, WV
Bid Date: May 12 2026
Bruceton Mills, WV
Bid Date: May 12 2026
Bruceton Mills, WV
Bid Date: Mar 26 2026
Bruceton Mills, WV
Bid Date: Nov 20 2025
Bruceton Mills, WV
--
Bruceton Mills, WV
Bid Date: Nov 20 2025
Bruceton Mills, WV
Bid Date: Jun 25 2025
Bruceton Mills, WV
Bid Date: Jun 25 2025
Bruceton Mills, WV
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed