BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 27, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Jasper, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of a 13-ton load posted bridge over Frost Creek with a 65-foot single span voided box beam bridge. Scope includes steel piling, concrete substructure, bridge barrier rail, prestressed concrete span sections, traffic control, erosion control, earthwork, and paving. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Question Deadline 07/10/2026 All questions about meaning or intent of the Contract Documents are to be directed to Engineer. Michael Rice (205) 424-3737 mrice@eefs-eng.com

Bid Results

Bridges / Tunnels

$650,000.00

Public - County

Demolition, New Construction, Paving, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
45
Bidding Soon
846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2026

September 14, 2026

Project location map

To Be Determined, Jasper, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.