Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 23, 2026 at 8:00 PM
Updated July 30, 2026
This is a service / maintenance or supply contract in Arlington, Virginia. Contact the soliciting agency for additional information.
This requirement is for the management of solid waste, including municipal solid waste (MSW), scrap metal, construction demolition debris (CDD), and single stream recycling (SSR) at Arlington National Cemetery. The contractor shall provide support for collecting and disposing of MSW, CDD, and SSR. The contractor must also support the relocation of waste collection infrastructure upon completion of the Southern Expansion project, which includes transportation, placement, and coordination activities to ensure uninterrupted operations and compliance with site requirements. The contractor shall remove all existing dumpsters from their current locations and deliver new dumpsters designated for the Southern Expansion site to the new waste collection area using appropriate vehicles and equipment. Dumpsters must be placed in accordance with approved site plans and accessibility requirements. The contractor shall minimize disruption to cemetery operations, ceremonies, and visitor access during the relocation and confirm final placement with the COR, reporting any issues encountered. The contractor is responsible for providing all necessary labor, equipment, materials, and a receiving facility to manage ANCs MSW, CDD, and SSR. Period of Performance From 01 Nov 2026 To 15 Nov 2026
Post-Bid
Religious / Funeral
$2,000,000.00
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed