Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 24, 2026 at 8:00 PM
Updated July 8, 2026
Site work and renovation of a civil project in Orem, Utah. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The purpose of this packet is to prequalify Contractors for several upcoming projects at OWRF, expected to be solicited in the next 5 years. The submittal requirements for the prequalification statement and the evaluation criteria are included. The City of Orem Water Reclamation Facility (OWRF) was constructed in 1953 with major upgrades in 1983 and 2010. The City completed a Capital Facilities Master Plan for the Water Reclamation Facility (WRF) in 2022. This plan recommended strategic upgrades to the facility over the 20-year planning horizon to keep the facility safe, effective, efficient, operational, and able to meet all current and anticipated treatment standards. OWRF liquid stream includes preliminary treatment, primary treatment, secondary treatment (bioreactors, oxidation ditches and clarifiers), tertiary treatment and UV disinfection. The solids process includes thickening, thermophilic and mesophilic digestion and dewatering. OWRF also includes various support facilities comprising but not limited to electrical buildings, pump stations, odor control systems, and control systems. The masterplan identified various projects associated with the facility liquid, solids and support facilities including upgrades to existing facilities and/or addition of new facilities and structures. The City is currently working on designs for several of these projects, including the following: New Headworks Screening and Grit Removal Facility; New Primary Effluent Pump Station and upgrades to RAS Pump Station; BNR system upgrades UV Disinfection Facility Expansion New Dewatering Facility with Administrative, Lab, and Office Spaces New Biosolids Conditioning System housed within its Mesophilic Digester Building Other projects listed in the OWRF masterplan - Phase 1 Projects.
GC Bidding
$3,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
1797 1000 S, Orem, UT
Related To This Project
Orem, UT
--
Orem, UT
Bid Date: Jun 25 2026
Orem, UT
Bid Date: Jun 11 2026
Orem, UT
Bid Date: May 27 2026
Orem, UT
--
Orem, UT
Bid Date: Jun 09 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: May 07 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
