BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a detention facility in Fort Myers, Florida. Completed plans call for the renovation of a detention facility; and for site work for a detention facility.

Replacement of sixteen (16) HVAC rooftop units, associated mechanical equipment including exhaust fans, and the complete removal and replacement of the existing Core I lower roof down to the structural deck, including restoration of the lightning protection system. Lee County Board of County Commissioners seeks to contract with a qualified CONTRACTOR to provide the complete replacement of sixteen (16) HVAC rooftop units and associated mechanical equipment, including exhaust fans, and the removal and replacement of the existing Core I lower roof located at the Lee County Jail Core Facility in Fort Myers, Florida. Work includes removal of all roofing materials down to the structural deck and installation of a new flat roofing system. The CONTRACTOR shall also perform all related and incidental work, including coordination with mechanical systems and restoration of the existing lightning protection system. 2. ROOFING SYSTEM REPLACEMENT 2.1. Complete tear-off and replacement of approximately 66,358 SF of the existing roofing system down to the structural deck, followed by installation of a new 50 mil KEE high-performance membrane roofing system. 2.2. Restore existing lightning protection system. 3. MECHANICAL - RTU AND EXAUST FAN REPLACEMENT 3.1. Replacement of 16 HVAC Rooftop Units (RTUs) and exhaust fans as indicated on the mechanical drawings. 3.2. Replacement of Direct-Expansion (DX) RTUs: RTU-A-1A, RTU-A-2A, RTU-A-2, RTU-C-2, MAU-1, MAU-2, and MAU-3. 3.3. Replacement of Kitchen Hood Make-up Air and Exhaust units: KSU-C-1, KSU-C-2, KSU-C-3, KSU-C-4, KHE-C-1, KHE-C-2, KHE-C-3, and KHE-C-4. 3.4. Replacement of Chilled Water Tri-Coil units and Exhaust Fan: RTU-A-1, RTU-B-1, RTU-C-1, RTU-D-1, and EF-D-1. This phase includes full testing and balancing of air devices and cleaning of the ductwork for RTU-C-1. 4. ELECTRICAL WORK 4.1. Provide all wiring, disconnects, and controls for replacement RTUs and exhaust fans. 4.2. Install conduit, panels, and electrical components per schedules and riser diagrams. 5. TECHNICAL SPECIFICATIONS 5.1. The detailed scope of work and CONTRACTOR responsibilities are further defined within the attached project plans provided as part of this solicitation. It is the responsibility of the CONTRACTOR to review and fully understand all associated project documents. Question Deadline 07/09/2026 at 5:00 PM ET Questions regarding this solicitation are to be submitted electronically on bid portal clarification or additional information pertaining to the solicitation shall be submitted in writing prior to least eight (8) calendar days prior to the date when the submission is due.

GC Bidding

$1,500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
38
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.