BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a civil project in Chicago, Illinois. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

Lawndale ES - Feed Water Tank and Station Replacement - Open to contracted pre-qualified pool for Various Trades ONLY All questions/requests must be received two (2) business days prior to bid closing Question Deadline 06/19/2026 Provide Labor and Materials: Page 2 . Provide Overview ofProject 1) Contractor to ensure materials are CPS Board approved: a. SECTION 23 21 23 Hydronic Pumps b. SECTION 23 22 14 STEAM AND CONDENSATE HEATING SPECIALTIES 2) Secure job site overnight ifwork is not completed in one day. 3) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 4) Provide necessary labor and materials to fix/correct issues preventing any or all ofthe projects to be marked as completed.5) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 6) Contractor is to remove and dispose of materials torn out and any construction debris. Various Trades Invitation to Bid 7) All trash must be removed off-site by contractor. 8) Clean the surrounding area and make sure all is swept of debris. 9) All questions/requests must be received two (2) business days prior to bid closing. Contractor to secure necessary permits. Contractor to field verify dimensions and specifics of all projects listed above before placing bid. Not responsible for contractor errors as a result of non-field verification. Materials and installation must comply with CPS Standards and Specifications as listed on a. SECTION 23 21 23 Hydronic Pumps b. SECTION 23 22 14 STEAM AND CONDENSATE HEATING SPECIALTIES Secure job site overnight if work is not completed in one day. If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. Contractor is to remove and dispose of materials torn out and any construction debris. All trash must be removed off-site by contractor. Clean the surrounding area and make sure all is swept of debris. All questions/requests must be received two (2) business days prior to bid closing

Bid Results

$98,875.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
53
Bidding Soon
4,028
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.