Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Renovation of a military facility in San Diego, California. Completed plans call for the renovation of a military facility.
The project requires all design and construction necessary to modernize the space, improve the customer experience, and replace outdated equipment across the ITT Center, Library, Gaming area, Brewhouse, food storage areas, meeting rooms, offices, and restrooms. The work includes all demolition, installation, renovation, temporary construction, and restoration necessary to deliver a complete and usable facility. Scope of work includes site investigation, site development and design, procurement and use of materials, demolition of existing elements, and all other construction and renovation efforts required to fully execute and complete the project in accordance with the described requirements. Project Location: The project is located at the Community Recreation Center (Bldg. 45) on the Navy Base San Diego installation, physical address being 45 Brisner St, San Diego, CA. B. Project Description: The project includes all design and construction necessary to modernize the space, improve the customer experience, and replace outdated equipment, ITT Center, Library, Gaming area, Brewhouse, along with food storage, meeting rooms, offices, and restrooms as described herein; including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. C. Project Budget: The total funds available for design and construction of the facility is $4,354,062.20. Proposals over this amount may not be considered. The Offeror shall refer to Section L for additional information regarding pricing. C-2. SCOPE OF WORK A. All Work shall be in accordance with the most stringent requirements of the applicable codes, laws and requirements governing Navy Base San Diego, and all other Authorities Having Jurisdiction (AHJ). B. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys (topographical, geotechnical, vegetative, etc.) and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility "pot holing") as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer's Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. Contractors shall further develop a design, conduct a code review, and improve on the design to meet all the program requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all new commercial grade materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. 4. Demolition: The Contractor shall remove and dispose of all existing finishes and material, including but not limited to, flooring, equipment, fixtures, finishes, two existing abandoned air-cooled chillers, associated pumps, abandoned original gas-fired boiler, all existing disconnects serving equipment that will be removed or no longer be in use shall be demolished back to source, and furniture as specified herein. The Contractor shall protect existing adjacent materials, especially structures and elements existing to remain, from any and all damage during the work, by utilizing walk pads, construction screens and other industry best practices protection methods. Any and all questions regarding the design, coordination, or interpretation of RFP requirements during the proposal phase shall be directed in writing to the Contracting Officer prior to submitting an offer.
GC Bidding
$4,354,062.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
45 Brisner St, San Diego, CA
Related To This Project
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
San Diego, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
