BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 23, 2026 at 8:00 PM

Updated July 7, 2026

Renovation of a transportation facility in Dalton, Georgia. Completed plans call for the renovation of a 15,400-square-foot transportation facility.

The project consists of roofing improvements to an existing airport hangar approximately 140 feet by 110 feet in size. The work consists of, but is not limited to, furnishing all labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for: HANGAR ROOF REHABILITATION PROJECT AIR202601 The location of the work is at the Dalton Municipal Airport, Dalton, Georgia. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the City, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. All work under the contract shall be completed within 30 Calendar Days from the issuance of the notice to proceed. Liquidated Damages: Liquidated damages for delays in completion will be $250 per calendar day. Payment will be made monthly on completed work. Retainage will be held by the City to a maximum of ten percent (10%) of each progress payment. Contractors must attend pre bid meeting in order to be considered for work on the project. Bids will be required to remain open for acceptance or rejection for 45 calendar days after the date of opening of bids. The Right to Reject Any or All Bids and to Waive Informalities is Reserved to the City.

Sub-Bidding

$4,620,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
37
Bidding Soon
1,800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.