BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2026 at 8:00 PM

Updated July 30, 2026

Site work, new construction and renovation of a mixed-use development in Franklin, Kentucky. Completed plans call for the construction of a municipal facility; water / sewer project; water / sewer project; for the renovation of a municipal facility; water / sewer project; water / sewer project; for site work for a municipal facility; water / sewer project; and water / sewer project.

Reroute segment of gravity line, replace existing pump station and force main, perform directional bore under pavement, install pretreatment grinder manhole, and reconstruct existing sewer manhole. Stabilize and reseed disturbed areas. PROJECT CONTACTS: Engineer: Richard Tutt, American Engineers Inc, richard.tutt@stvinc.com, (270) 404-5821 Project Manager: Jacob Huber, Division of Engineering and Contract Administration, jacob.huber@ky.gov, (502) 782-5061 Agency: Christopher Smith, Kentucky Transportation Cabinet, christophert.smith@ky.gov, (502) 782-5061 Purchasing Agent: Janis Wilhoite, Division of Engineering and Contract Administration, janis.wilhoite@ky.gov, (502) 401-6239 All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. Q/A:- All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered. This project intends to reroute a segment of gravity line and replace an existing Pump Station and Force Main serving the I-65 Northbound Welcome Center in Simpson County, KY. The gravity portion will require directional bore under a pavement segment to maintain truck traffic. The manhole immediately upstream of the station will be replaced with a "pretreatment" grinder/manhole combination called a "Muffin Monster". The current station has developed consistent malfunction and requires the KYTC to mobilize a pump trunk to evacuate the existing pump station wet well at an exorbitant monthly cost. It is suspected the existing force main has developed downstream issues affecting the ability of the existing system to function. The KYTC, through the KY Dept of Finance and DECA, elected to replace the station and force main. A portion of the force main traverse's private property ( KY DOWNS Gaming, Horse Racing and Hotel Complex) and will require a utility easement for new routing until it ends at an existing sewer manhole owned and maintained by the City of Franklin. This manhole will be reconstructed as part of the project. Stabilize/reseed all disturbed areas affected by the scope of work.

Bid Results

$1,087,861.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
61
Bidding Soon
1,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

September 21, 2026

Project location map

I-65, Franklin, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.