BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 8, 2026

Site work and new construction of a communication facility in Tampa, Florida. Conceptual plans call civil work for a communications tower.

The Hillsborough County Aviation Authority invites interested Design-Build firms to submit qualifications to provide professional design and construction services for the design and construction of the Air Traffic Control Tower (ATCT) Replacement at Tampa International Airport. The project will utilize the progressive Design-Build methodology. The new ATCT will be located at Site 18A, within an approximately 2-acre parcel in the northwest quadrant of the Main Terminal complex. The scope includes the replacement of the existing ATCT facility originally constructed in the early 1970s, which is currently operated, owned, and maintained by the Federal Aviation Administration. Question Deadline 07/15/2026 at 5:00 PM ET

Conceptual

$50,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
73
Bidding Soon
2,589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.