BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 11, 2026

Site work and paving for a road / highway in Atlanta, Georgia. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The proposed project (Columbia County PI 0021741) consists of widening an approximately 2.4-mile section of North Belair Road (CR 580) from two lanes to three lanes, extending from Evans to Locks Road to SR 28 (Fury's Ferry Road). To improve corridor-wide safety and operational efficiency, the project will feature one mainline travel lane in each direction, a continuous central turning lane, and select right-turn deceleration lanes designed to effectively separate turning movements from through traffic at high-volume side streets. A key component of this corridor modernization is the installation of a shared-use path, which will provide vital multimodal connectivity for cyclists and pedestrians between the Furys Ferry Road (SR 28) corridor and Evans Town Center. The project scope also encompasses all associated infrastructure and safety upgrades at the CSX railroad crossing. The selected consultant will be responsible for delivering all project phases-including concept development, field surveys/database establishment, environmental documentation, public involvement support, preliminary construction plans, subsurface utility engineering (SUE), active utility coordination and relocation management (GDOT Chapter 14 compliance), right-of-way plans, and final construction plans-in strict accordance with current GDOT policies, guidelines, and the Plan Development Process (PDP). Questions Due Date: Jul 8th 2026, 5:00 PM EDT Questions Online Portal Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to: Chris Landers, email: clanders@columbiacountyga.gov The Georgia Department of Transportation Board has adopted a 15% overall annual goal for DBE participation on all federally funded projects. The method of Contractor Selection has not been Determined at this time.

Conceptual

$500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
22
Bidding Soon
2,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.