BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2026 at 8:00 PM

Updated July 8, 2026

Renovation of a mixed-use development in Holyoke, Massachusetts. Completed plans call for the renovation of a educational facility.

The Holyoke School Department is soliciting quotes for the removal and replacement of the flooring at 3 Schools. Dean Tech, Morgan, Metcalf School. Work is to include the removal of old flooring and installation of either VCT or carpet tile. The old flooring is to be removed, and the installation of either VCT or carpet tile. Dean and Morgan will receive VCT, and Metcalf will receive carpet tile. 1. Provide the necessary means and methods to remove the existing flooring at Dean and Metcalf. Each section of flooring is to be removed and disposed of correctly. 2. Provide the necessary means and methods to install new VCT at Dean and Morgan, with a color to be chosen at a later date. 3. Provide the necessary means and methods to install new carpet tile at Metcalf. The carpet tile must have materials containing the following: Nylon: The industry standard for heavy commercial traffic; highly resilient and stain-resistant, or Polypropylene (Olefin): Budget-friendly and moisture-resistant; common in basements. Flammability (ASTM E 648): Class I is the highest standard required for commercial spaces. Sustainability: Certifications like CRI Green Label Plus guarantee low VOC emissions. With a color to be chosen at a later date. 4. Dean is 1,000 sqft, Morgan is 750 sqft, and both will get VCT. 5. Metcalf is 1,050 sqft of carpet tile. 6. Provide new materials by installing them per the manufacturer sinstructions. Provide the proper installation of the products provided by the contractor per the manufacturers installation instructions. 7. Maintain a clean work area, collaborating with the owner for storage of materials and equipment. The disposal of all demolition materials and job site waste is the responsibility of the contractor and must be included in their bid. 8. Provide any building permits, if needed, to the building department and post them in the correct location. 9. Provide a punch list walkthrough with the Director of Facilities and Maintenance when the job has been completed. Correct an items identified, and once completed, the final job completion wil be satisfactory per the schools assigned representative. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The city reserves the right to reject any and all bids.

Sub-Bidding

$75,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
784
Active Projects
64
Bidding Soon
5,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.