Published June 25, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a mixed-use development in Saratoga Springs, New York. Completed plans call for the renovation of a playground / park / athletic field; road / highway; for site work for a playground / park / athletic field; and road / highway.

Replacement of overhead primary electrical service to an underground 13.2 kV system including removal of existing poles/wires, installation of buried duct bank, transformers, switchgears, service connections, horizontal directional drilling, asphalt/concrete/topsoil restoration, streetlight installation, and traffic control. Engineer's Estimate Range:$4,110,830.00 - $5,561,711.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project involves the replacement of the overhead primary electric service with an underground system within the southern portion of Saratoga Spa State Park. The existing overhead wire, poles, and pole mounted transformers are to be removed. Installation of duct bank, electric service cables, manholes, pullboxes, switchgears, and transformers to be completed. Work also includes horizontal directional drilling under Geyser Creek. This project includes, but is not limited to the following: Replacement of the overhead primary electrical service to an underground 13.2 kV system within the southern portion of the Saratoga Spa State Park along with installing service connections to all existing facilities. The limits of the work are East-West Road from Route 50 to Route 9 and Geyser Loop Road from East-West Road to the Orenda Pavilion. Contract work to include: 1. Removal of existing overhead wires, poles, and pole mounted equipment, 2. Installation of a buried duct bank consisting of conduit and electric service cables, 3. Installation of pullboxes, manholes, ground mounted transformers, switchgears, and other electrical equipment along with related connections to existing facilities, 4. Coordination with National Grid as required for the installation of a new primary meter pole and riser pole, 5. The conversion of the existing dual ratio single phase pad-mounted transformers on North-South Rd, and the existing dual ratio Peerless Pool three phase pad-mounted transformer from 4.160 kV to 13.2 kV, 6. Restoration of trenches to match existing surfaces asphalt / concrete / topsoil / seed), 7. Horizontal directional drilling of duct bank underneath Geyser Creek, 8. Installation of two streetlight poles, 9. Removal of one tree, 10. Installation of temporary erosion control measures, 11. Work zone traffic control including signing and flaggers as necessary. At least one travel lane is to remain open during work hours on all roads. Both travel lanes will need to be opened daily at end of workday Question Deadline 07/06/2026 at 5:00 PM ET RFIs shall be sent to James Killon at James.Killon@parks.ny.gov.

GC Bidding

$5,561,711.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
24
Bidding Soon
2,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

19 Roosevelt Dr, Saratoga Springs, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.